| Site | Consumption | Cost | ₹/kWh | EPI Score | Grade | vs Budget | Power Factor |
|---|---|---|---|---|---|---|---|
| Mumbai — Vikhroli | 1,42,000 kWh | ₹14.06L | 9.90 | 87 | B+ | ₹18,400 saved | 0.94 |
| Delhi — Sector 62 | 1,08,000 kWh | ₹10.69L | 9.90 | 91 | A | ₹24,800 saved | 0.96 |
| Bengaluru | 91,000 kWh | ₹9.01L | 9.90 | 94 | A+ | ₹31,200 saved | 0.97 |
| Hyderabad | 1,24,000 kWh | ₹12.28L | 9.90 | 89 | B+ | ₹12,600 saved | 0.92 |
| Pune | 98,000 kWh | ₹9.70L | 9.90 | 82 | B | ₹4,800 over | 0.88 |
| Kolkata | 59,000 kWh | ₹5.84L | 9.90 | 88 | B+ | ₹8,200 saved | 0.93 |
| Site | Client | City | Health | Connectivity | Devices | Gateways | Alarms | SLA | Last Seen |
|---|
| Device | Type | Site | Status | Signal | Firmware | Last Seen | Action |
|---|
| Severity | Event | Site | Source | Raised | Status | Action |
|---|
| Ticket | Site / Client | Issue | Severity | Tier | SLA | Owner | Status |
|---|
| Rank | Site | Client | Uptime (30d) | MTTR | MTBF | Open |
|---|
Daily Operational Summary
Vikhroli campus is operating at 93% overall health. Cooling demand is tracking 4% above the seasonal baseline; the AI advanced CH-02 ahead of CH-01 to hold COP above target. 3 equipment failures are predicted within 7 days — most urgent is AHU-07 (filter ΔP trending to alarm in ~5 days). Five optimisation opportunities are open, with an estimated ₹2.4L/month recoverable, led by chilled-water reset and peak-tariff load shifting. No SLA breaches occurred overnight; 2 remain at risk today.
impact
impact
impact
| Equipment | Risk Score | Time-to-Failure | Impact | Trend | Action |
|---|---|---|---|---|---|
| AHU-07 Air Handling · Zone 3 | 92 | ~5 days | High | ↑ rising | |
| PMP-03 Cond. Pump · Plant | 81 | ~12 days | High | ↑ rising | |
| CHWP-02 CHW Pump · Plant | 68 | ~16 days | Medium | → stable | |
| Lift-04 Door Actuator · Tower B | 64 | ~18 days | High | ↑ rising | |
| CT-01 Cooling Tower · Roof | 52 | ~24 days | Medium | → stable |
Shift CHWS to 7.8 °C off-peak and pre-cool Zones 1–2 before the 14:00 demand peak. Comfort bands stay within ±0.5 °C.
Shift 220 kWh of deferrable load out of the 18:00–22:00 peak-tariff window using thermal storage and lift scheduling.
Rebalance CH-01/CH-02 staging to hold both nearer peak COP instead of running CH-01 at low part-load.
Tie AHU airflow and lighting to live occupancy on Floors 4–6, which run 40% vacant before 10:00 and after 19:00.
| Recommendation | Equipment | Priority | Window | Confidence | Action |
|---|---|---|---|---|---|
| Replace AHU filter ΔP trending to alarm — airflow loss in Zone 3 | AHU-07 | Urgent | within 5 days | 96% | |
| Motor vibration trend abnormal — inspect bearing Vibration RMS +22% over 14 days | PMP-03 | Urgent | within 7 days | 88% | |
| Lubricate & cycle-test door actuator Cycle count above service interval | Lift-04 | Soon | within 18 days | 84% | |
| Clean condenser tubes — approach temp rising Fouling reduces heat transfer | CT-01 | Soon | within 24 days | 82% | |
| Recalibrate CHW flow sensor Drift detected vs energy balance | CHWP-02 | Planned | next PM cycle | 79% |
| ID | Description | System | Priority | Age | Assigned | Status |
|---|---|---|---|---|---|---|
| #INC-042 | HVAC Zone C — Temp Breach | AHU Zone C | P1 | 2h 10m | HVAC Team A | In Progress |
| #INC-041 | Lift-04 Door Sensor Fault | Lift-04 | P1 | 2h 6m | LiftPro Contractor | Open |
| #INC-040 | High Condenser Pressure — Chiller | CH-01 | P1 | 39m | HVAC Team B | Assigned |
| WO # | Description | Location | Priority | Trade | Due By | Status |
|---|---|---|---|---|---|---|
| #WO-1042 | AC not cooling — Room 704 | Floor 7 | High | HVAC | 11:30 AM | In Progress |
| #WO-1041 | Water leakage — Lobby ceiling | Ground | Critical | Plumbing | OVERDUE | Open |
| #WO-1040 | Lift-04 Door Sensor | Tower A | Critical | Lift | 12:00 PM | Contractor Called |
| #WO-1038 | Parking gate arm — jammed | Basement B1 | Medium | Civil | 01:00 PM | Assigned |
| #WO-1036 | Lights flickering — Floor 3 pantry | Floor 3 | Low | Electrical | 03:00 PM | Scheduled |
| Meter ID | Location | Type | Active Power (kW) | Reactive (kVAR) | PF | Freq (Hz) | Units Today (kWh) | Status |
|---|---|---|---|---|---|---|---|---|
| M-001 | Main Incomer | 3Φ LT | 4,820 | 1,540 | 0.94 | 50.0 | 28,500 | Online |
| M-002 | HVAC DB — B1 | 3Φ | 1,245 | 420 | 0.95 | 50.0 | 7,410 | Online |
| M-003 | Lighting DB — Fl 1–3 | 1Φ | 96 | 12 | 0.99 | 50.1 | 570 | Online |
| M-004 | Lighting DB — Fl 4–7 | 1Φ | 82 | 10 | 0.99 | 50.0 | 490 | Online |
| M-005 | Lifts — Tower A | 3Φ | 28 | 8 | 0.96 | 50.0 | 168 | Online |
| M-006 | Solar Array | DC/AC | 168 | 0 | 1.00 | 50.0 | 1,240 | Online |
| M-007 | DG Set B2 | 3Φ | 0 | 0 | — | 50.0 | 0 | Standby |
| M-008 | Kitchen / Cafeteria | 3Φ | 180 | 55 | 0.96 | 50.0 | 1,070 | Online |
| Asset | Type | Due Date | Assigned | Status |
|---|---|---|---|---|
| CH-01 Chiller | Quarterly Service | 22 May | HVAC Team A | Scheduled |
| Lift-04 Door Sensor | Fault Repair | ASAP | Lift Contractor | Overdue |
| AHU-01 Filter | Filter Replacement | 28 May | HVAC Team B | Pending |
| CT-01 Water Treatment | Chemical dosing check | 25 May | Water Team | Scheduled |
| DG-01 Diesel Genset | Monthly Run Test | 20 May | Electrical Team | Done |
| Asset ID | Asset Name | PM Type | Frequency | Due Date | Vendor | Status |
|---|---|---|---|---|---|---|
| CH-01 | Centrifugal Chiller | Quarterly Service | Q | 22 May | CoolTech HVAC | Scheduled |
| LIFT-04 | Elevator — Tower A | Fault Repair + PM | ASAP | ASAP | LiftPro India | Overdue |
| AHU-01 | Air Handling Unit | Filter Replacement | M | 28 May | HVAC Team B | Pending |
| CT-01 | Cooling Tower | Water Treatment | M | 25 May | AquaPure | Scheduled |
| DG-01 | Diesel Genset | Monthly Run Test | M | 20 May | In-house | Done |
| FP-01 | Fire Panel | Quarterly Check | Q | 15 Jun | FireGuard | Upcoming |
| SLR-01 | Solar Array | Panel Cleaning | M | 01 Jun | SolarMax | Upcoming |
| Asset | Fault | Reported | Severity | Assignee | Status |
|---|---|---|---|---|---|
| CH-01 Chiller | High condenser pressure + low CHW flow | 10:21 AM | Critical | HVAC Team B | In Progress |
| Lift-04 | Door sensor fault — Car out of service | 10:18 AM | Critical | LiftPro India | Open |
| AHU-01 | Filter ΔP high — service due | 08:45 AM | Warning | HVAC Team A | Acknowledged |
| CT-01 | High entering water temp | 10:10 AM | Warning | CoolTech HVAC | Open |
| Asset | Make / Model | Install Date | Warranty Expiry | AMC Status | Vendor |
|---|---|---|---|---|---|
| CH-01 Chiller | Carrier 30XA / 700 TR | Jan 2022 | Jan 2027 | Active | CoolTech HVAC |
| AHU-01 | York / 60,000 CFM | Mar 2022 | Mar 2026 | Active | HVAC Team |
| Lift Group (5 cars) | Otis / 13-person | Jun 2019 | Jun 2024 (exp) | AMC Only | LiftPro India |
| Solar Array 200 kWp | Trina Solar / Fronius | Jan 2023 | Jan 2033 | 10-yr | SolarMax Energy |
| DG-01 (1000 kVA) | Cummins KTA50 | Feb 2020 | Feb 2026 (3m) | Expiring | Cummins India |
| # | Description | Floor | Raised By | Priority | Age | Status | Action |
|---|---|---|---|---|---|---|---|
| #1042 | AC not cooling — Room 704 | Floor 7 | Tenant A | High | 3h 20m | In Progress | |
| #1041 | Water leakage — Lobby | Ground | Security | Critical | 5h | Open | |
| #1040 | Lift-04 stuck alarm | All | FM Team | Critical | 2h | Escalated | |
| #1038 | Parking gate malfunction | Basement | Guard | Medium | 1h | In Progress | |
| #1036 | Lights flickering — L3 pantry | Floor 3 | HR Team | Low | 4h | Assigned |
| # | Description | Raised | Closed | Duration | Closed By | Rating |
|---|---|---|---|---|---|---|
| #1035 | AC filter choked — Floor 5 | Yesterday 09:00 | Yesterday 11:30 | 2h 30m | HVAC Team A | ⭐⭐⭐⭐⭐ |
| #1034 | Tap leaking — 3rd floor restroom | Yesterday 08:00 | Yesterday 10:15 | 2h 15m | Plumbing Team | ⭐⭐⭐⭐ |
| #1033 | Broken chair — Conference Room A | 18 May 14:00 | 18 May 16:00 | 2h | FM Team | ⭐⭐⭐⭐⭐ |
| #1032 | Visitor access card — expired | 18 May 11:00 | 18 May 11:45 | 45m | Security | ⭐⭐⭐⭐⭐ |
| # | Description | Priority | SLA Limit | Open Since | Time Remaining | Action |
|---|---|---|---|---|---|---|
| #1041 | Water leakage — Lobby | P1 Critical | 4 hrs | 5h ago | BREACHED | |
| #1042 | AC not cooling — Room 704 | P2 High | 8 hrs | 3h 20m ago | 4h 40m left |
| Floor | Total sqft | Occupied | Available | Tenant | Status |
|---|---|---|---|---|---|
| Basement B1 | 18,000 | 18,000 | — | Parking / MEP | Services |
| Ground | 24,000 | 20,000 | 4,000 | Common + Retail | Active |
| Floor 1 | 38,000 | 38,000 | — | Godrej Corporate | Owned |
| Floor 2 | 38,000 | 34,960 | 3,040 | Mixed Tenants | 92% Full |
| Floor 3 | 38,000 | 38,000 | — | Single Tenant | 100% Full |
| Floor 4 | 38,000 | 31,160 | 6,840 | Mixed Tenants | 82% Full |
| Floor 5 | 38,000 | 38,000 | — | Single Tenant | 100% Full |
| Floor 6 | 38,000 | 38,000 | — | Godrej Corporate | Owned |
| Floor 7 | 38,000 | 15,200 | 22,800 | Partial / Available | Leasing |
22,800 sqft available (Floor 7)
| Company | Area Needed | Stage | Broker | Expected Close | Revenue/yr |
|---|---|---|---|---|---|
| Prospect A (IT Firm) | 15,000 sqft | Due Diligence | JLL | Jun 2026 | ₹2.52Cr |
| Prospect B (BFSI) | 22,800 sqft | LOI Issued | Direct | Jul 2026 | ₹3.83Cr |
| Prospect C (Pharma) | 11,400 sqft | Site Visit | CBRE | Aug 2026 | ₹1.92Cr |
| Prospect D (MNC) | 8,000 sqft | Initial Contact | Cushman | Sep 2026 | ₹1.34Cr |
| Asset | Anomaly Type | Detected | Confidence | Impact | Action |
|---|---|---|---|---|---|
| CH-01 Chiller | Compressor current spike pattern | 10:18 AM | 97% | High Energy Loss | |
| CT-01 Cooling Tower | Approach temp drift — bearing wear indicator | 09:42 AM | 84% | Predictive Maint. | |
| PMP-01 Pump | Vibration signature change — cavitation risk | 08:55 AM | 79% | PM Recommended | |
| LT-01 Lighting | Consumption 18% above floor schedule | 08:30 AM | 88% | Energy Waste | |
| SLR-01 Solar | Panel temp 4°C above ambient model | 07:55 AM | 76% | Efficiency Drop |
| Asset | Anomaly | Detected | Resolved | Duration | Resolution |
|---|---|---|---|---|---|
| CH-01 | Low CHW flow rate | 12 May 10:00 | 12 May 12:14 | 2h 14m | Pump strainer cleaned |
| AHU-02 | High filter ΔP | 10 May 08:30 | 11 May 09:00 | 24h 30m | Filter replaced |
| LT-01 | Zone 3 over-schedule | 08 May 09:00 | 08 May 11:20 | 2h 20m | Schedule corrected |
| PMP-02 | Discharge pressure spike | 05 May 14:00 | 05 May 15:45 | 1h 45m | PRV adjusted |
| Rule Name | System | Condition | Sensitivity | Status |
|---|---|---|---|---|
| Chiller COP Degradation | Chiller | COP < 5.5 for 30 min | Medium | Active |
| AHU Filter Clog Predictor | AHU | ΔP trend > 8 Pa/day | Low | Active |
| Pump Vibration Signature | Pumps | FFT pattern change >15% | High | Active |
| Energy Over-Schedule | All | >20% vs scheduled baseline | Medium | Active |
| Cooling Tower Approach Drift | CT | Approach temp rise >1°C/7d | Medium | Active |
| System | Task | Due Date | Frequency | Technician | Status |
|---|---|---|---|---|---|
| CH-01 Chiller | Quarterly service + water treatment | 22 May 2026 | Quarterly | HVAC Team A | Scheduled |
| BMS Controllers | Firmware update + calibration | 25 May 2026 | Half-yearly | BMS Engineer | Scheduled |
| IoT Gateways (×8) | Network health check + reboot | 28 May 2026 | Monthly | IT / BMS | Scheduled |
| SCADA Server | DB backup + OS patches | 31 May 2026 | Monthly | IT Team | Scheduled |
| UPS — Server Room | Battery test + load transfer test | 05 Jun 2026 | Quarterly | Electrical Team | Pending |
| System | Fault Description | Since | Impact | Assignee | Status |
|---|---|---|---|---|---|
| HVAC Zone C | Temperature controller offline — Floor 7 | 08:14 AM | High | HVAC Team A | In Progress |
| Lift-04 | Door sensor fault — communication error | 10:18 AM | High | LiftPro Contractor | Open |
| IoT Gateway G-07 | Network timeout — 8 sensors unreachable | Yesterday | Medium | IT Team | Investigating |
| Severity | Alert | System | Time | Status | Action |
|---|---|---|---|---|---|
| Critical | High Condenser Pressure | CH-01 Chiller | 10:21 AM | Open | |
| Critical | HVAC Temp Breach Floor 7 | AHU Zone C | 08:14 AM | Escalated | |
| Critical | Door Sensor Fault | Lift-04 | 10:18 AM | Open | |
| Warning | Low Chilled Water Flow | CH-01 | 10:15 AM | Ack'd | |
| Warning | High Water Temp | CT-01 | 10:10 AM | Open | |
| Warning | High Vibration Detected | PMP-01 | 09:55 AM | Ack'd | |
| Warning | Unauthorized Access — Loading Bay | CAM-08 | 10:22 AM | Open |
| Alert | System | Value | Threshold | Time | Status |
|---|---|---|---|---|---|
| Low Chilled Water Flow | CH-01 | 118 m³/h | 130 m³/h min | 10:15 AM | Ack'd — monitoring |
| High Entering Water Temp | CT-01 | 36.4°C | 35°C limit | 10:10 AM | Open |
| High Vibration | PMP-01 | 2.1 mm/s | 2.0 mm/s | 09:55 AM | Ack'd — PM booked |
| Unauthorized Access | CAM-08 | Motion detected | Restricted zone | 10:22 AM | Open — security alerted |
| Alert | System | Raised | Closed | Duration | Closed By |
|---|---|---|---|---|---|
| High Filter ΔP | AHU-02 | 07:30 AM | 09:15 AM | 1h 45m | HVAC Team B |
| Low Battery — Fire Panel | FP-01 | 06:45 AM | 07:30 AM | 45m | Auto-resolved |
| Damper stuck — AHU-03 | AHU-03 | Yesterday 23:00 | 08:00 AM | 9h | FM Team |
| Power factor low | MB-01 | Yesterday 22:00 | 06:00 AM | 8h | Auto-resolved |
| Bill Type | Period | Amount | Due Date | Status | Action |
|---|---|---|---|---|---|
| Electricity — MSEDCL | Apr 2026 | ₹14.06L | 25 May | Paid | ↓ Download |
| Electricity — DG Fuel (HSD) | Apr 2026 | ₹2.80L | 20 May | Paid | ↓ Download |
| Water — MCGM | Apr 2026 | ₹1.20L | 28 May | Paid | ↓ Receipt |
| HVAC Maintenance AMC | May 2026 | ₹1.50L | 31 May | Paid | ↓ Receipt |
| Elevator AMC | May 2026 | ₹0.80L | 15 Jun | Upcoming | — |
| Report | Frequency | Time | Format | Recipients (To / CC) | Retry on Fail | Last Sent | Status | Action |
|---|---|---|---|---|---|---|---|---|
| Daily HLP Report | Daily | 07:00 AM | PDF + XLSX | CE, Property Head / GM, Ops Head | 3× / 30 min | Today 07:00 | Active | Edit |
| Daily DMR Report | Daily | 07:00 AM | PDF + XLSX | CE, Property Head / Energy Mgr | 3× / 30 min | Today 07:00 | Active | Edit |
| Daily Ops Summary | Daily | 07:00 AM | FM, GM, Property Head | On | Today 07:00 | Active | Edit | |
| Weekly Energy Report | Every Monday | 08:00 AM | XLSX + PDF | Energy Mgr, CFO | On | 05 May | Active | Edit |
| Monthly CO₂ & ESG | 1st of month | 09:00 AM | Sustainability Head, Board | On | 01 May | Active | Edit | |
| SLA Compliance Report | 1st of month | 09:00 AM | XLSX + PDF | FM, Ops Head | On | 01 May | Active | Edit |
| Asset PM Schedule | Weekly · Mon | 07:00 AM | XLSX | FM, Maintenance Team | On | 05 May | Active | Edit |
| Anomaly Digest | Weekly · Fri | 18:00 | FM, Engineering Head | On | 02 May | Failed 09 May | Retry |
| Report | Generated | By | Format | Action |
|---|---|---|---|---|
| Energy by Floor — May | Today 08:45 | Rajesh S. | XLSX | ↓ Download |
| SLA Report — Apr–May | 09 May 07:00 | System | ↓ Download | |
| CO₂ Comparison Q1 | 08 May 15:30 | Priya M. | ↓ Download | |
| Vendor Scorecard Q1 | 07 May 11:00 | Arun K. | XLSX | ↓ Download |
| Asset PM Summary | 06 May 09:00 | System | XLSX | ↓ Download |
| Date / Time | Shift | Key Readings | Recorded By | Remarks | Sign-off | Action |
|---|
| Entry | Logbook | Recorded By | Logged | Waiting | Add Remark & Sign-off |
|---|
| Vendor | Category | Contact | Contract Value | Contract Expires | Scorecard | Status |
|---|---|---|---|---|---|---|
| CoolTech HVAC Pvt Ltd | HVAC Maintenance | Ravi Kumar | ₹18L/yr | 31 Jul 2026 | 91% | Active |
| SparkElec Services | Electrical Maintenance | Anjali S. | ₹12L/yr | 31 May 2026 | 78% | Expiring |
| LiftPro India | Elevator AMC | Suresh P. | ₹9.6L/yr | 30 Sep 2026 | 88% | Active |
| AquaPure Water Mgmt | Water Treatment | Priya M. | ₹6L/yr | 15 Jun 2026 | 75% | Expiring |
| SecureEye CCTV | Security & Surveillance | Deepak V. | ₹8L/yr | 31 Dec 2026 | 95% | Active |
| FireGuard Systems | Fire Safety AMC | Arun K. | ₹7.2L/yr | 28 Feb 2027 | 92% | Active |
| CleanBuild FM | Housekeeping & FM | Meena R. | ₹36L/yr | 31 Mar 2027 | 67% | Under Review |
| SolarMax Energy | Solar O&M | Kiran T. | ₹4.8L/yr | 31 Oct 2026 | 97% | Active |
| Vendor | Category | Expiry | Renewal Value | Stage | Action |
|---|---|---|---|---|---|
| SparkElec Services | Electrical | 31 May 2026 | ₹13.2L/yr (+10%) | Negotiation | |
| AquaPure Water | Water Treatment | 15 Jun 2026 | ₹6.6L/yr (+10%) | Draft Sent | |
| LiftPro India | Elevator AMC | 30 Sep 2026 | ₹10.2L/yr (+6%) | Not Started | |
| SolarMax Energy | Solar O&M | 31 Oct 2026 | ₹5.0L/yr (+4%) | Not Started |
| Invoice # | Vendor | Amount | Invoice Date | Due Date | Days Outstanding | Status |
|---|---|---|---|---|---|---|
| INV-2026-0442 | CoolTech HVAC | ₹1,50,000 | 01 May | 31 May | 8 | Approved |
| INV-2026-0438 | CleanBuild FM | ₹3,00,000 | 25 Apr | 25 May | 14 | Paid |
| INV-2026-0421 | SparkElec | ₹98,000 | 15 Apr | 15 May | 24 | Approved |
| INV-2026-0408 | LiftPro India | ₹80,000 | 08 Apr | 08 May | 31 | Overdue |
| INV-2026-0401 | AquaPure | ₹50,000 | 01 Apr | 01 May | 38 | Overdue |
| Ticket # | Description | Priority | SLA Target | Time Open | Remaining | Assigned To |
|---|---|---|---|---|---|---|
| #1041 | Water leakage — Main Lobby | Critical P1 | 4 hrs | 5 hrs 12 min | BREACHED | FM Team — pending contractor |
| #1042 | AC not cooling — Room 704 | High P2 | 8 hrs | 3 hrs 20 min | 4 hrs 40 min | HVAC Team A — in progress |
| Ticket # | Description | Priority | SLA | Actual Close | Overrun | Root Cause | Resolution |
|---|---|---|---|---|---|---|---|
| #1041 | Water leakage — Lobby | P1 | 4 hrs | 5 hrs 12 min | +72 min | Contractor unavailable | Pending |
| #1029 | HVAC total failure — Floor 4 | P1 | 4 hrs | 5 hrs 48 min | +108 min | Part unavailable | Closed |
| #1017 | Lift stuck — Tower B | P2 | 8 hrs | 9 hrs 20 min | +80 min | Technician delay | Closed |
| Location | Route | Exit Width | Emergency Light | Signage | Status |
|---|---|---|---|---|---|
| Stairwell S1 — Tower A | All floors → Ground | 1.5m | Working | OK | Clear |
| Stairwell S2 — Tower A | All floors → Ground | 1.5m | Working | OK | Clear |
| Fire Escape — East Wing | Fl 4–7 → Ground | 1.2m | FL4 Dim ⚠ | OK | Work Order |
| Main Lobby Exit | Ground → Assembly A | 4.5m | Working | OK | Clear |
| Basement Exit B1 | B1 → Open Air | 2.4m | Working | OK | Clear |
| Terrace Access | Roof → Helo Evac | 0.9m | Working | OK | Clear |
| Incident # | Description | Date | Location | Severity | Injured | Status | Investigator |
|---|---|---|---|---|---|---|---|
| INC-2026-018 | Slip on wet floor — Lobby | 18 May 2026 | Ground Lobby | Minor | 1 (visitor) | Investigation | Safety Officer |
| INC-2026-015 | Near-miss — electrical panel open | 12 May 2026 | Basement B1 | Moderate | 0 | Root Cause Analysis | EHS Manager |
| Incident # | Description | Date | Severity | Root Cause | Closed |
|---|---|---|---|---|---|
| INC-2026-012 | Minor cut — maintenance work | 02 May | Minor | PPE not worn | 09 May ✓ |
| INC-2026-008 | Near-miss — ladder fall risk | 14 Apr | Moderate | Improper ladder use | 22 Apr ✓ |
| INC-2026-003 | Smoke detector false alarm | 20 Mar | Minor | Dusty sensor | 21 Mar ✓ |
| Certificate | Issuing Authority | Valid Until | Status |
|---|---|---|---|
| Fire NOC | Mumbai CFO / MCFD | 31 Dec 2026 | Valid |
| Occupancy Certificate | MCGM | Permanent | Valid |
| Lift Inspection Certificate | Dept. of Steam Boilers | 30 Jun 2026 | Renewal Due |
| Electrical Safety Audit | MSEDCL / CEA | 15 Jan 2027 | Valid |
| DG Set Registration | Pollution Control Board | 31 Jul 2026 | Renewal Due |
| Water Treatment License | BMC | 31 Mar 2027 | Valid |
| LEED Certification | IGBC / GBCI | Nov 2027 | Gold |
| ISO 45001 — OHS | Bureau Veritas | Oct 2026 | Certified |
| Parameter | ASHRAE 62.1 Limit | WELL v2 Limit | Current Avg | Worst Zone | Status |
|---|---|---|---|---|---|
| CO₂ | 1000 ppm (max) | 1000 ppm | 712 ppm | 1148 ppm (F5A) | 1 Zone Breach |
| PM2.5 | 15 µg/m³ (24h) | 15 µg/m³ | 14.2 µg/m³ | 18.4 µg/m³ (F5A) | Pass (avg) |
| TVOC | 500 ppb | 500 ppb | 168 ppb | 280 ppb | Pass |
| Relative Humidity | 30–60% | 30–60% | 54% | 57% | Pass |
| Temperature | 20–26°C (ASHRAE 55) | 18–27°C | 23.2°C | 24.0°C | Pass |
| CO (Parking) | 25 ppm TWA | 9 ppm | 4.2 ppm | 4.2 ppm | Pass |
| HCHO (Formaldehyde) | 0.1 ppm | 0.06 ppm | 0.02 ppm | 0.03 ppm | Pass |
| Date | Avg CO₂ | Avg PM2.5 | Worst Zone | Action |
|---|---|---|---|---|
| 27 May | 712 ppm | 14.2 µg/m³ | F5A — 1148 | DCV Active |
| 26 May | 688 ppm | 11.8 µg/m³ | F4 — 842 | Normal |
| 25 May | 704 ppm | 12.1 µg/m³ | F6 — 888 | Normal |
| 24 May | 664 ppm | 10.4 µg/m³ | F4 — 814 | Normal |
| Time | Card Holder | Door / Reader | Zone | Direction | Result |
|---|---|---|---|---|---|
| 10:24:12 | Rajesh Kumar | Floor 5 — Server Room | Restricted | IN | GRANTED |
| 10:22:48 | Unknown Card | Rooftop Access | Roof | IN | DENIED |
| 10:21:05 | Priya Sharma | Main Lobby | Ground | IN | GRANTED |
| 10:19:44 | Delivery Personnel | Loading Bay | Ground | IN | GRANTED |
| 10:17:33 | Amit Verma | Car Park Exit | B1 | OUT | GRANTED |
| 10:15:22 | Anti-Passback | Floor 3 — Lift Lobby | Tower A | IN | DENIED |
| 10:12:08 | Suman Bose | Main Lobby | Ground | IN | GRANTED |
| 10:09:55 | Security Guard A | Control Room | Ground | IN | GRANTED |
| Group | Zones Allowed | Active Users | Time Restriction |
|---|---|---|---|
| Full Access | All zones | 12 | 24×7 |
| Employees | Floors 1–7, Parking | 1,420 | 06:00–22:00 |
| Contractors | Basement, Mechanical | 48 | 08:00–18:00 |
| IT Admin | Server Room (F5), Control | 6 | 24×7 + OTP |
| Visitors | Lobby, Meeting Rooms | 84 | 09:00–19:00 |
| Permit # | Type | Work Description | Contractor | Issued | Closed | Status |
|---|---|---|---|---|---|---|
| PTW-2026-042 | LOTO | MCC-B2 Cable Replacement | Voltex Electricals | 27 May 08:00 | — | Active |
| PTW-2026-041 | Hot Work | Condenser Pipe Welding | IndoWeld Services | 27 May 07:30 | — | Active |
| PTW-2026-040 | Cold Work | AHU Filter Replacement — B3 | CoolAir Maint | 26 May 09:00 | 26 May 13:30 | Closed |
| PTW-2026-039 | Height | False Ceiling — Floor 4 | BuildFix India | 25 May 08:00 | 25 May 17:00 | Closed |
| PTW-2026-038 | Confined | Underground Tank Cleaning | CleanPro Services | 23 May 07:00 | 23 May 15:00 | Closed |
URI versioning (/api/v1/…). Breaking changes ship a new major version; the previous one is supported for a 6-month deprecation window flagged in this registry.
OAuth2 / JWT bearer tokens at the gateway. Short-lived access tokens + refresh tokens. Every endpoint declares the role/scope it requires (RBAC).
Per-client token-bucket limits returned via X-RateLimit-* headers. Telemetry ingest and report exports have dedicated higher quotas.
Standard envelope: { error: { code, message, traceId } } with correct HTTP status codes. traceId links to logs for support.
Cursor-based pagination (?cursor=&limit=) for large collections. Standard sort, filter and fields query params across list endpoints.
Every endpoint is described by an OpenAPI 3.1 spec. This registry is generated from the same contract so docs and reality never drift.
Structured logs, distributed tracing (trace IDs) and per-endpoint latency/error dashboards. Health & readiness probes on every service.
Input validation, output encoding, least-privilege DB roles, secrets in a vault, signed webhooks, and audited admin actions. OWASP API Top-10 reviewed each release.
This page is the single source of truth. When any module or page changes: (1) add/update the endpoint in the catalog with its owning module, (2) set the correct status (stable / beta / deprecated) and version, (3) note auth scope & rate-limit class, and (4) confirm the OpenAPI spec matches. Reviewed at every release sign-off.
--bg-0 → --bg-2) with surfaces that lift off the page. A light theme mirrors every token.--radius), 10px for cards. Hairline borders, soft inner highlights, restrained shadows.var(--info), never a raw hex. Tokens flip correctly between dark & light..card, .kpi, .badge, .btn and .pill cover most layouts.--font-mono to numbers, IDs and timestamps..btn · .btn.primary.kpi with .glow-* status rail.ch) + body (.cb).ct, subtitle via .cs, optional action link via .ca, content in .cb.