BuildOptix
Dashboard
Equipment
GOC
AI
26°C 10:24 AM · 20 May 2026
Showing weather for Mumbai — Vikhroli, not your current location
Mumbai · Vikhroli · 19.1°N 72.9°E
28°C
Partly Cloudy
H: 31°C · L: 25°C
10:24 AM IST
Current
Details
Impact
Humidity
77%
Very humid
Wind
15 km/h N
Gentle breeze
Feels Like
30°C
Slightly warm
UV Index
4 Moderate
Peak at 3 PM
View site:
Mumbai
Delhi
Bengaluru
Hyderabad
10:24 AM
Portfolio Energy (MTD)
4.82MWh
↘ 3.1% vs last month
Active Alarms
7
3 critical · 4 warning
Sites Online
5 / 6
1 degraded — Chennai
Avg System Health
93%
↑ 2% vs last week
CO₂ Saved Today
1,932kg
via solar generation
Logbooks · Pending Sign-off
7
CE / Property Head
Portfolio Load Distribution — Live
kW consumption by site · 10:24 AM
Mumbai — Vikhroli
680 kW
Delhi — Sector 62
520 kW
Hyderabad
480 kW
Bengaluru
440 kW
Pune
390 kW
Kolkata
310 kW
Site Energy Share
% of portfolio · May 2026
4.82 MWh
Mumbai30%
Delhi23%
Hyderabad20%
Bengaluru17%
Others10%
Site-wise Energy Performance — May 2026
Export XLSX →
SiteConsumptionCost₹/kWhEPI ScoreGradevs BudgetPower Factor
Mumbai — Vikhroli1,42,000 kWh₹14.06L9.9087B+₹18,400 saved0.94
Delhi — Sector 621,08,000 kWh₹10.69L9.9091A₹24,800 saved0.96
Bengaluru91,000 kWh₹9.01L9.9094A+₹31,200 saved0.97
Hyderabad1,24,000 kWh₹12.28L9.9089B+₹12,600 saved0.92
Pune98,000 kWh₹9.70L9.9082B₹4,800 over0.88
Kolkata59,000 kWh₹5.84L9.9088B+₹8,200 saved0.93
Portfolio CO₂ (MTD)
842tCO₂e
Scope 1+2 combined
Solar Offset (MTD)
−148tCO₂e
Net Carbon Intensity
0.48kgCO₂/kWh
ESG Score
78/100
GRESB benchmark
Monthly CO₂ Emissions — Portfolio
tCO₂e · Jan–May 2026
1000800600 JanFebMarAprMay ↓
ESG KPIs — Portfolio
Total CO₂ (YTD)3,840 tCO₂e
Solar Offset (YTD)−620 tCO₂e
Renewable Share18.4%
Water Consumption1,240 kL/mo
Waste Recycled62%
LEED StatusGold — Vikhroli
IGBC Rating4★ Certified
Portfolio Map — 6 Sites
All Sites
Online Only
Alarms
Mumbai 680 kW · 2 alarms Delhi 520 kW · 0 alarms Bengaluru Hyderabad Pune Kolkata Degraded Online Warning Degraded
Mumbai — Vikhroli
Live Load680 kW
EPI87
Alarms2
Delhi — Sector 62
Live Load520 kW
EPI91
Alarms0
Kolkata
Live Load310 kW
EPI88
StatusDegraded
Portfolio Consumption (MTD)
4.82MWh
↓ 3.1% vs last month
Total Energy Cost (MTD)
₹34.2L
₹2.1L savings
Solar Generation
340kWh/d avg
Avg Tariff
₹9.90/kWh
Monthly Energy Trend — All Sites
kWh · Jan–May 2026
Full Energy Page →
5.2M4.8M4.4M4.0M JanFebMarAprMay ↓
BuildOptix GOC — Watch Floor
Live --:--:-- Auto-refresh 30s
India — Live Site Map
Click a city to view its sites
AllAlarmsOffline
Online
Degraded
Offline
Critical Alarm Feed
All sites · auto-prioritised
Open console →
Fleet & Connectivity
Top Open Incidents
All →
SLA Posture — by Client
Detail →
All Client Sites
Real-time health, connectivity & SLA across the portfolio
AllOnlineDegradedOffline
SiteClientCityHealthConnectivityDevicesGatewaysAlarmsSLALast Seen
Gateway & Controller Diagnostics
Edge gateways · controllers · sensor nodes — all sites
AllGatewaysControllersSensors
DeviceTypeSiteStatusSignalFirmwareLast SeenAction
Firmware & OTA
Version distribution & update rollout
Alarm & Event Console
Real-time · all client sites · ack / assign / escalate
AllCriticalWarning
SeverityEventSiteSourceRaisedStatusAction
NOC Incident Queue
Tiered triage · SLA timers · escalation
Open Service Desk →
TicketSite / ClientIssueSeverityTierSLAOwnerStatus
Escalation Matrix
L1 · Triage
NOC Watch Desk
Ack < 5 min · monitors feed, runs first diagnostics
On-call: A. Khan
L2 · Diagnostics
Remote Engineers
Esc < 30 min · remote troubleshooting, OTA, config
On-call: S. Rao
L3 · Engineering
Field + Vendor
Esc < 2 h · dispatch, RCA, vendor coordination
On-call: R. Sharma
SLA Compliance — by Client
Fleet Uptime — 30 days
% devices reporting
100%98%96%
Alarms by Category — 30 days
Site Reliability Ranking
Uptime · MTTR · MTBF · open incidents
RankSiteClientUptime (30d)MTTRMTBFOpen
Remote Troubleshooting
Target a device and run a remote action — every action is logged & audited
Reboot Gateway
Soft-reboot the edge gateway and re-establish cloud heartbeat.
Push Firmware (OTA)
Roll out the latest firmware to the selected device over-the-air.
Run Diagnostics
Full health scan — comms, sensors, memory, signal strength.
Ping / Heartbeat
Send an ICMP + MQTT heartbeat test and measure latency.
Restart Service
Restart the BACnet/Modbus polling service on the controller.
Clear Comms Fault
Reset the comms-fault flag and force a re-subscribe of points.
Remote Session Log
Live console output — auditable
Clear
BuildOptix Reasoning Generated 06:00 IST · 31 May 2026

Daily Operational Summary

Vikhroli campus is operating at 93% overall health. Cooling demand is tracking 4% above the seasonal baseline; the AI advanced CH-02 ahead of CH-01 to hold COP above target. 3 equipment failures are predicted within 7 days — most urgent is AHU-07 (filter ΔP trending to alarm in ~5 days). Five optimisation opportunities are open, with an estimated ₹2.4L/month recoverable, led by chilled-water reset and peak-tariff load shifting. No SLA breaches occurred overnight; 2 remain at risk today.

Predicted Failures (7d)
3
1 critical · 2 warning
Optimisation Opportunities
5
₹2.4L/mo recoverable
Anomalies Detected
5
live · auto-prioritised
Model Confidence
94%
avg across insights
Top AI Recommendations
Ranked by impact & confidence
Service AHU-07 supply filter before 5 Jun
Filter ΔP rising 6 Pa/day — projected to cross the 250 Pa alarm in ~5 days, cutting airflow to Zone 3.
Confidence 96%
Reset chilled-water setpoint 7.0 → 7.8 °C off-peak
Outdoor wet-bulb allows a higher CHWS without comfort loss — saves an estimated 38 kWh/day on chiller power.
Confidence 91%
Inspect PMP-03 — abnormal vibration trend
Vibration RMS up 22% over 14 days with rising bearing temperature — early signature of bearing wear.
Confidence 88%
Predicted Failures
Risk matrix →
AHU-07 Supply FilterZone 3 · Airflow loss
~5 days
PMP-03 BearingCondenser loop · Vibration
~12 days
Lift-04 Door ActuatorTower B · Cycle count
~18 days
Optimisation Opportunities
All →
Chilled-water resetHVAC scheduling
₹34k/mo
Peak-tariff load shiftTariff optimisation
₹88k/mo
Occupancy-based AHUFloors 4–6
₹52k/mo
Assets at Risk
7
of 2,148 monitored
High Severity
2
immediate attention
Avg Time-to-Failure
11days
across flagged assets
Model Confidence
94%
prognostics engine
Risk Matrix
Impact × Likelihood
Low
Medium
High
High
impact
1Lift-04
1PMP-03
1AHU-07
Med
impact
0
2CT-01, EF-03
1CHWP-02
Low
impact
0
1VAV-12
0
Equipment Risk Register
Prognostic scores · time-to-failure · severity
EquipmentRisk ScoreTime-to-FailureImpactTrendAction
AHU-07
Air Handling · Zone 3
92~5 daysHigh↑ rising
PMP-03
Cond. Pump · Plant
81~12 daysHigh↑ rising
CHWP-02
CHW Pump · Plant
68~16 daysMedium→ stable
Lift-04
Door Actuator · Tower B
64~18 daysHigh↑ rising
CT-01
Cooling Tower · Roof
52~24 daysMedium→ stable
Alarm Correlation
12 raw alarms grouped into 1 root cause
Active
Probable root cause — Condenser water flow restriction
Confidence 89% · Plant cooling loop
A cluster of 12 alarms across CH-01, CT-01 and PMP-03 over the last 40 minutes correlates to a single upstream condenser-water flow restriction. Treating the root cause clears the dependent alarms.
CH-01 High Cond. Pressure10:21 · downstream
PMP-03 Low Flow10:18 · root
CT-01 High Water Temp10:22 · downstream
Operational Anomaly Explanation
Chiller COP dropped 0.6 at 10:05
The drop coincides with reduced condenser-water flow (PMP-03) rather than load change — efficiency loss is mechanical, not demand-driven. Expected recovery once flow is restored. Energy impact so far: +42 kWh.
Equipment Dependency Map
Affected chain
PMP-03Cond. Pump
CH-01Chiller
CHW LoopDistribution
AHU Zone 3Comfort
Failure at the root node propagates downstream — prioritise PMP-03 to protect comfort in Zone 3.
HVAC Scheduling Optimisation
Chilled-water reset & pre-cool

Shift CHWS to 7.8 °C off-peak and pre-cool Zones 1–2 before the 14:00 demand peak. Comfort bands stay within ±0.5 °C.

Energy−38 kWh/d
Savings₹34k/mo
ComfortNeutral
Tariff Optimisation
Peak-shaving & load shift

Shift 220 kWh of deferrable load out of the 18:00–22:00 peak-tariff window using thermal storage and lift scheduling.

Peak cut−180 kW
Savings₹88k/mo
CO₂−1.2 t/mo
Load Balancing
Chiller sequencing

Rebalance CH-01/CH-02 staging to hold both nearer peak COP instead of running CH-01 at low part-load.

COP+0.4
Savings₹26k/mo
RuntimeBalanced
Occupancy-Based Control
Floors 4–6 · AHU & lighting

Tie AHU airflow and lighting to live occupancy on Floors 4–6, which run 40% vacant before 10:00 and after 19:00.

Energy−61 kWh/d
Savings₹52k/mo
ComfortNeutral
AI Operational Timeline
Chronological AI insights & actions · today
10:22 IST
Root cause identified — condenser flow restriction
Correlated 12 alarms to PMP-03; recommended priority dispatch.
10:05 IST
Anomaly — chiller COP dropped 0.6
Flagged as mechanical (flow), not load-driven. Tracking energy impact.
08:40 IST
Optimisation applied — chiller staging rebalanced
COP improved +0.3 after CH-02 lead swap. Holding above target.
07:15 IST
Predicted failure — AHU-07 filter (~5 days)
Filter ΔP trend extrapolated to alarm threshold; recommended service.
06:00 IST
Daily operational summary generated
93% health · 3 predicted failures · ₹2.4L/mo optimisation headroom.
Open Recommendations
6
AI-generated
Urgent (≤7d)
2
act this week
Auto-drafted WOs
3
pending approval
Avg Confidence
90%
across recs
AI Maintenance Recommendations
Predictive · prioritised by urgency & impact
RecommendationEquipmentPriorityWindowConfidenceAction
Replace AHU filter
ΔP trending to alarm — airflow loss in Zone 3
AHU-07Urgentwithin 5 days96%
Motor vibration trend abnormal — inspect bearing
Vibration RMS +22% over 14 days
PMP-03Urgentwithin 7 days88%
Lubricate & cycle-test door actuator
Cycle count above service interval
Lift-04Soonwithin 18 days84%
Clean condenser tubes — approach temp rising
Fouling reduces heat transfer
CT-01Soonwithin 24 days82%
Recalibrate CHW flow sensor
Drift detected vs energy balance
CHWP-02Plannednext PM cycle79%
3 critical open 9 resolved today Last updated: 09 May 2026, 09:00 AM
Overall Score
92.4
↑ 2.1% vs last month
Open Tickets
47
↓ 12 since yesterday
Critical Alerts
3
— unchanged
SLA Compliance
96.8%
↑ 0.4% this week
HVAC Unit B3 — Temperature threshold breach · Floor 7, Wing C08:14 AM
Lift No. 4 (Tower A) preventive maintenance overdue by 3 daysYesterday
Planned power shutdown: Basement G2 — Sunday 11 May, 01:00–05:00 AMPlanned
Energy Consumption Trend
kWh · Last 7 days vs prior week
140012001000800 MonTueWedThuFriSatSun
System Health
Live status · 14 systems
HVAC — Zones A, B, D
OK
HVAC — Zone C, Fl. 7
Alert
Fire Safety
OK
Lift No. 4 (Tower A)
PM Due
Security & Access
OK
Open Incidents
3
Resolved Today
9
Avg Age (Open)
2.4hrs
P1 Incidents (MTD)
5
Live Incident Queue
Real-time · Vikhroli Campus
IDDescriptionSystemPriorityAgeAssignedStatus
#INC-042HVAC Zone C — Temp BreachAHU Zone CP12h 10mHVAC Team AIn Progress
#INC-041Lift-04 Door Sensor FaultLift-04P12h 6mLiftPro ContractorOpen
#INC-040High Condenser Pressure — ChillerCH-01P139mHVAC Team BAssigned
Open Work Orders
47
Completed Today
9
Overdue
4
Avg Completion Time
1.6hrs
Work Order Queue
+ New WO
WO #DescriptionLocationPriorityTradeDue ByStatus
#WO-1042AC not cooling — Room 704Floor 7HighHVAC11:30 AMIn Progress
#WO-1041Water leakage — Lobby ceilingGroundCriticalPlumbingOVERDUEOpen
#WO-1040Lift-04 Door SensorTower ACriticalLift12:00 PMContractor Called
#WO-1038Parking gate arm — jammedBasement B1MediumCivil01:00 PMAssigned
#WO-1036Lights flickering — Floor 3 pantryFloor 3LowElectrical03:00 PMScheduled
Daily Ops Score
92.4
SLA Compliance
96.8%
Tickets Resolved (MTD)
248
Avg Response Time
18min
Daily Ops Score Trend
Last 7 days
MonTueWedThuFriSatToday
Quick Links
⚡ Electricity
⛽ Fuel
💧 Water
🔥 Gas
● LIVE
Updated: 20 May 2026 · 10:24 AM
↓ 3.1%
6,553 kWh
Today's Consumption
EB: 6,553 · DG: 0
₹18K saved
₹64,875
Today's Energy Cost
₹9.90/kWh · Peak tariff
↑ 12%
1,240 kWh
Solar Generation
88% capacity · ₹12,276 saved
Grade B+
87/100
EPI Score
Target: 90 · Gap: 3 pts
−28.6t solar
3.14 tCO₂
Today's Carbon
Net: 0.48 kgCO₂/kWh
Daily Consumption — May 2026
kWh · Click any bar to drill down by hour
Daily
Monthly
Grid Solar Budget Click a bar → hourly breakdown
12K 9K 6K 3K 0 Budget 1 2 3 4 5 6 7 8 9 10 11 12 13↑ 14 15 16 17 18 19 20● 21 22 23 24 25
MTD Total
1,42,000 kWh
Avg Daily
6,290 kWh
Peak Day
10,668 kWh
vs Budget
↓ ₹2.1L saved
Consumption Split
6,553 kWh today
HVAC 2,865 43.7%
Kitchen 1,180 18%
Lighting 655 10%
Lifts 262 4%
Others 1,591 24.3%
Cost Breakdown
Energy charges₹47,818
Demand charges₹29,400
Solar savings−₹12,276
Net Cost Today ₹64,942
LT Panel Distribution
kWh · Click panel bar to drill down
400 200 0 3008F & Terrace B-1 Ramp 135GF Panel 169STP & WTP 138UPS Panel 1382F Kitchen 7F Panel 107Lift Panel 262Heat Pump 1431F Old Panel 1128F Panel 965F Panel 45QMIN GF
Incomer kWh
6000 3000 500 5,663 TRF 1 1,120 TRF 2
AI Insights
Live analysis · updated 10:24 AM
⚠ Peak anomaly — Day 13
10,668 kWh — 69% above avg. Likely full HVAC load + event. Ask AI →
✓ Chiller setpoint opportunity
Raise CHWS by 0.5°C → save ~₹4,200/day. Ask AI →
ℹ May forecast
Projected MTD: 1.58L kWh · Cost: ₹15.6L. Under budget ✓
Transformer
DG
Chiller
HVAC
Cooling Tower
Updated: 20 May 2026 · 10:24 AM
Transformer 1600 kVa UC
KW
KW
35025015050 11:0811:0911:1011:1111:12
KVA
KVA
500350200 11:0811:1011:12
Load (%)
Load%
15105 11:0811:1011:12
Amperes
Current 1 Current 2 Current 3
25015050 11:0811:1011:12
Voltage
Voltage 1 Voltage 2 Voltage 3
250225200 11:0811:1011:12
PF (Power Factor)
PF
1.00.80.6 11:0811:1011:12
Total Meters
24
all online
Main Incomer
4,820kW
now
DG Supply
0kW
standby
Solar Net Export
0kW
all consumed
Meter Register — Live Readings Logbook
All sub-meters · 20 May 2026 · 10:24 AM
Export →
Meter IDLocationTypeActive Power (kW)Reactive (kVAR)PFFreq (Hz)Units Today (kWh)Status
M-001Main Incomer3Φ LT4,8201,5400.9450.028,500Online
M-002HVAC DB — B11,2454200.9550.07,410Online
M-003Lighting DB — Fl 1–396120.9950.1570Online
M-004Lighting DB — Fl 4–782100.9950.0490Online
M-005Lifts — Tower A2880.9650.0168Online
M-006Solar ArrayDC/AC16801.0050.01,240Online
M-007DG Set B20050.00Standby
M-008Kitchen / Cafeteria180550.9650.01,070Online
Bill (May MTD)
₹14.06L
₹18,400 under budget
Peak TOD Cost
₹9.90/kWh
06:00–22:00 weekday
Solar Savings MTD
₹4.16L
42,000 kWh × ₹9.90
Demand Charge
₹13.44L
4,800 kVA × ₹280
Daily Cost Breakdown — May 2026
₹ · Energy + Demand + Fixed
90K70K50K30K 1 3 5 7 9 11 13 15 17 ← Day of Month (May) Energy charge Demand charge
Cost vs Budget
75%
of budget
₹14.06L spent of ₹18.75L budget
₹4.69L remaining with 10 days left
Energy charges
₹10.62L
Demand charges
₹13.44L
Solar savings
−₹4.16L
Our EPI
87
Grade B+
Industry Avg EPI
78
Commercial India 2026
Best-in-Class
96
Platinum IGBC
kWh/sqft/yr
38.5
target <40
EPI Benchmark — Commercial Real Estate India
2026 · Vikhroli vs peers
Platinum (>95)
96
Best Similar
92
▶ BuildOptix
87
Industry Avg
78
Lowest Quartile
62
Site Comparison — All Locations
kWh/sqft/yr · May 2026
Bengaluru
32.1
Delhi
35.2
▶ Vikhroli
38.5
Hyderabad
41.0
Pune
45.2
Kolkata
38.0
Site:
Date:
Updated: 20 May 2026 · 11:14 AM
Chiller Consumption
Chiller 1 Chiller 2
5000 3500 2000 500 1 3 5 7 9 11 13 15 17 19 21 23 25 31 Days
Total Consumption
Total Chiller Total Aux
5000 3000 1500 1 10 20 28 Days
Chiller Temp Graph
Evap Leaving Evap Entering Cond Entering Cond Leaving
35 25 15 5 1 10 20 28 Days
FloorWise Cooling Temperature
Return Air Supply Air
30 25 20 15 1 10 20 28 Days
CHW AHU Module
Zone temperatures · Live
BackOffice-3rdFloorAvg: 20.9
20.9
BallroomArea-2ndFloorAvg: 27.6
29.6
25.6
BallroomArea-8thFloorAvg: 22.6
22.9
22.3
MintAreaAvg: 29.87
31.0
29.3
29.3
Prefunction-8thFloorAvg: 25.4
25.4
SwrilAreaAvg: 26.7
25.6
27.8
TangoAreaAvg: 26.1
25.8
26.4
ZiraAreaAvg: 26.1
24.9
27.3
≤22°C OK 22–26°C >26°C High
Total Assets
2,148
registered
Healthy
2,089
97.3%
PM Due / Overdue
43
this month
Critical Faults
2
open incidents
Critical Assets — Quick Jump
Click to open equipment detail
CH-01 Chiller
⚠ High Condenser Pressure
Health: 92% · Running
Lift-04
⚠ Door Sensor Fault
Health: 78% · Alarm
CT-01 Cooling Tower
ℹ PM due in 5 days
Health: 93% · Running
SLR-01 Solar
✓ Generating normally
Health: 100% · Active
PM Schedule — This Month
AssetTypeDue DateAssignedStatus
CH-01 ChillerQuarterly Service22 MayHVAC Team AScheduled
Lift-04 Door SensorFault RepairASAPLift ContractorOverdue
AHU-01 FilterFilter Replacement28 MayHVAC Team BPending
CT-01 Water TreatmentChemical dosing check25 MayWater TeamScheduled
DG-01 Diesel GensetMonthly Run Test20 MayElectrical TeamDone
PM Due This Month
43
Overdue
4
Completed (MTD)
28
PM Completion Rate
87%
Full PM Schedule — May & June 2026
Export →
Asset IDAsset NamePM TypeFrequencyDue DateVendorStatus
CH-01Centrifugal ChillerQuarterly ServiceQ22 MayCoolTech HVACScheduled
LIFT-04Elevator — Tower AFault Repair + PMASAPASAPLiftPro IndiaOverdue
AHU-01Air Handling UnitFilter ReplacementM28 MayHVAC Team BPending
CT-01Cooling TowerWater TreatmentM25 MayAquaPureScheduled
DG-01Diesel GensetMonthly Run TestM20 MayIn-houseDone
FP-01Fire PanelQuarterly CheckQ15 JunFireGuardUpcoming
SLR-01Solar ArrayPanel CleaningM01 JunSolarMaxUpcoming
Active Faults
2
Closed (MTD)
14
Recurring Faults
3
same asset >2x
Avg Resolution Time
3.8hrs
Fault Log — Active & Recent
HVAC Logbook
AssetFaultReportedSeverityAssigneeStatus
CH-01 ChillerHigh condenser pressure + low CHW flow10:21 AMCriticalHVAC Team BIn Progress
Lift-04Door sensor fault — Car out of service10:18 AMCriticalLiftPro IndiaOpen
AHU-01Filter ΔP high — service due08:45 AMWarningHVAC Team AAcknowledged
CT-01High entering water temp10:10 AMWarningCoolTech HVACOpen
Assets Under Warranty
12
Expiring (90d)
3
Expired
2
Total AMC Value
₹86L/yr
Warranty Register
AssetMake / ModelInstall DateWarranty ExpiryAMC StatusVendor
CH-01 ChillerCarrier 30XA / 700 TRJan 2022Jan 2027ActiveCoolTech HVAC
AHU-01York / 60,000 CFMMar 2022Mar 2026ActiveHVAC Team
Lift Group (5 cars)Otis / 13-personJun 2019Jun 2024 (exp)AMC OnlyLiftPro India
Solar Array 200 kWpTrina Solar / FroniusJan 2023Jan 203310-yrSolarMax Energy
DG-01 (1000 kVA)Cummins KTA50Feb 2020Feb 2026 (3m)ExpiringCummins India
Live Consumption
4,820kW
76% of 6.3 MW capacity
EPI Score
87
Grade B+ · target 90
Occupancy Today
1,840pax
Active Alarms
2
Solar Now
168kW
Floor-wise Energy — Today
Basement B1
480 kW
Ground + Lobby
360 kW
Floors 1–3
800 kW
Floors 4–6
700 kW
Floor 7 (partial)
280 kW
Mechanical Floor
620 kW
System Availability
HVAC Zones A/B/D
OK
HVAC Zone C — Floor 7
Alert
Fire Safety
Normal
Lift-04 — Tower A
Fault
Solar Array
Generating
Scope 1 (Direct)
42.6tCO₂e
Scope 2 (Electricity)
128.4tCO₂e
Solar Offset
−28.6tCO₂e
Net Carbon Intensity
0.48kgCO₂/kWh
Scope 1 — Direct Emissions
DG Fuel (HSD)38.4 tCO₂e
Refrigerant Leakage4.2 tCO₂e
Total Scope 142.6 tCO₂e
Scope 2 — Grid Electricity
Grid Import (MTD)1,42,000 kWh
Emission Factor0.82 kgCO₂/kWh
Total Scope 2128.4 tCO₂e
Solar Renewable Offset
Generation (MTD)42,000 kWh
Offset Factor0.68 kgCO₂/kWh
Total Offset−28.6 tCO₂e
Consumption MTD
1.42LkWh
Cost MTD
₹14.06L
Solar MTD
42,000kWh
Power Factor
0.94
Energy by System
Chiller Plant
743 kWh
AHU System
257 kWh
Lighting
285 kWh
Lifts
72 kWh
IT / Misc
71 kWh
Tariff & Savings
TOD Peak Rate₹9.90/kWh
TOD Off-peak₹6.20/kWh
Demand Charge₹280/kVA
Solar Savings MTD₹12,276
Total vs Budget₹18,400 saved
EPI Score
87
Grade B+
Target
90
Grade A threshold
Gap
3 pts
Star Rating
4★
EPI Components
HVAC Efficiency
85/100
Lighting Controls
90/100
Building Envelope
82/100
Renewables
88/100
Metering & Controls
92/100
Improvement Actions
Chiller Setpoint +0.5°C
+1.5 EPI pts · ₹4,200/day saving
LED Upgrade Floor 4
+0.8 EPI pts · ROI 18 months
Solar Expansion 100 kWp
+0.7 EPI pts · ₹18L/yr
Today Peak
4,820kW
at 11:00 AM
Sanctioned Demand
6,300kW
76.5% utilised
TOD Peak Rate
₹9.90/kWh
Demand Response Saving
₹42,000/mo
15-Min Interval Demand — Today
500040003000 Peak 4,820 kW · 11:00 06:0008:0010:0012:0014:00
Open Tickets
47
3 critical SLA breach
Resolved Today
9
avg close 1.4 hrs
SLA Compliance
94.2%
target 95%
Avg Response Time
18min
SLA target 30 min
Live Complaint Queue
+ New Ticket
#DescriptionFloorRaised ByPriorityAgeStatusAction
#1042AC not cooling — Room 704Floor 7Tenant AHigh3h 20mIn Progress
#1041Water leakage — LobbyGroundSecurityCritical5hOpen
#1040Lift-04 stuck alarmAllFM TeamCritical2hEscalated
#1038Parking gate malfunctionBasementGuardMedium1hIn Progress
#1036Lights flickering — L3 pantryFloor 3HR TeamLow4hAssigned
Closed Today
9
Closed This Week
42
Avg Satisfaction
4.2/5
MTD Closed
248
Recently Closed Tickets
#DescriptionRaisedClosedDurationClosed ByRating
#1035AC filter choked — Floor 5Yesterday 09:00Yesterday 11:302h 30mHVAC Team A⭐⭐⭐⭐⭐
#1034Tap leaking — 3rd floor restroomYesterday 08:00Yesterday 10:152h 15mPlumbing Team⭐⭐⭐⭐
#1033Broken chair — Conference Room A18 May 14:0018 May 16:002hFM Team⭐⭐⭐⭐⭐
#1032Visitor access card — expired18 May 11:0018 May 11:4545mSecurity⭐⭐⭐⭐⭐
Breaches (May)
3
Near-Breach Now
2
Compliance
94.2%
target 95%
P1 SLA Limit
4hrs
At-Risk Tickets — SLA Breach Imminent
#DescriptionPrioritySLA LimitOpen SinceTime RemainingAction
#1041Water leakage — LobbyP1 Critical4 hrs5h agoBREACHED
#1042AC not cooling — Room 704P2 High8 hrs3h 20m ago4h 40m left
MTD Tickets
304
vs Last Month
↓ 12%
CSAT Score
4.2/5
Top Category
HVAC
38% of all tickets
Tickets by Category — May MTD
HVAC / Cooling
116 (38%)
Electrical
74 (24%)
Plumbing
52 (17%)
Civil / General
34 (11%)
Security
28 (10%)
Resolution Time Distribution
< 1 hour
107
1–4 hours
167
4–8 hours
37
> 8 hours
15
Portfolio Occupancy
90%
3.8L / 4.2L sqft occupied
Today Footfall
1,840
↑ 6% WoW
Available for Lease
22,800sqft
Floor 7 — Tower A
Meeting Room Utilisation
68%
peak 10–11 AM
Floor-wise Occupancy
Vikhroli · All towers · Live
FloorTotal sqftOccupiedAvailableTenantStatus
Basement B118,00018,000Parking / MEPServices
Ground24,00020,0004,000Common + RetailActive
Floor 138,00038,000Godrej CorporateOwned
Floor 238,00034,9603,040Mixed Tenants92% Full
Floor 338,00038,000Single Tenant100% Full
Floor 438,00031,1606,840Mixed Tenants82% Full
Floor 538,00038,000Single Tenant100% Full
Floor 638,00038,000Godrej CorporateOwned
Floor 738,00015,20022,800Partial / AvailableLeasing
Space Utilisation Breakdown
90%
Occupied
Portfolio Occupancy
3.8L of 4.2L sqft in use
22,800 sqft available (Floor 7)
Office Space
90.5%
Meeting Rooms
68%
Cafeteria (peak)
85%
Parking
78%
Server Room
100%
Total Built-up Area
4.2Lsqft
Office Space
3.60Lsqft
85.7% of total
Common Areas
0.42Lsqft
10% of total
Available for Lease
22,800sqft
Floor 7
Floor 7 — Available Space Layout
Tower A · 22,800 sqft · Shell & Core
Download PDF →
West Wing ~11,400 sqft · Available East Wing ~11,400 sqft · Available CORE Lifts
Floor ConditionShell & Core
HVAC Capacity300 TR available
Power Provision160 kW LT supply
Today Footfall
1,840
↑ 6% WoW
Peak Hour
10–11 AM
busiest period
Avg MTD Footfall
1,720
↑ vs 1,640 last month
Weekend Avg
420
23% of weekday
Hourly Footfall — Today
Entry gate count · 20 May
40028016040 07 08 09 10 ★ 11 12 13 14 15 16
Footfall by Floor — Peak Hour
10–11 AM today
Ground + Café
360
Floor 1
400
Floor 3
350
Floor 5
330
Floor 6
300
Floor 7
100
Available for Lease
22,800sqft
Floor 7 — Tower A
Asking Rent
₹140/sqft/mo
Market: ₹135–150
Active Prospects
4
2 in due diligence
Potential Revenue
₹3.19Cr/yr
if fully leased
Active Leasing Prospects
Pipeline tracker
Export →
CompanyArea NeededStageBrokerExpected CloseRevenue/yr
Prospect A (IT Firm)15,000 sqftDue DiligenceJLLJun 2026₹2.52Cr
Prospect B (BFSI)22,800 sqftLOI IssuedDirectJul 2026₹3.83Cr
Prospect C (Pharma)11,400 sqftSite VisitCBREAug 2026₹1.92Cr
Prospect D (MNC)8,000 sqftInitial ContactCushmanSep 2026₹1.34Cr
Space Specs — Floor 7
Total Available22,800 sqft
HVAC Capacity300 TR
Power Provision160 kW LT
Parking Slots38 slots (2-level)
Min Lock-in3 years
Monthly Potential₹31.9L
Active Anomalies
5
AI detected
Under Review
3
pending ack
Resolved (30d)
42
avg resolve 2.1 hrs
Precision Rate
94%
AI model accuracy
Active Anomalies — AI Detected
AssetAnomaly TypeDetectedConfidenceImpactAction
CH-01 ChillerCompressor current spike pattern10:18 AM97%High Energy Loss
CT-01 Cooling TowerApproach temp drift — bearing wear indicator09:42 AM84%Predictive Maint.
PMP-01 PumpVibration signature change — cavitation risk08:55 AM79%PM Recommended
LT-01 LightingConsumption 18% above floor schedule08:30 AM88%Energy Waste
SLR-01 SolarPanel temp 4°C above ambient model07:55 AM76%Efficiency Drop
Energy Anomalies
2
Mechanical
2
Environmental
1
Security
0
By System Category
HVAC / Cooling
3
Electrical
2
Plumbing
1
Fire Safety
0
By Severity
5Active
Critical2
Warning2
Info1
Avg Detection Lead Time
Mechanical
4.2 hrs
Energy
2.8 hrs
Environmental
6.1 hrs
Resolved (30d)
42
Avg Resolve Time
2.1hrs
False Positives
4
AI Accuracy
94%
Resolved Anomalies — Last 30 Days
AssetAnomalyDetectedResolvedDurationResolution
CH-01Low CHW flow rate12 May 10:0012 May 12:142h 14mPump strainer cleaned
AHU-02High filter ΔP10 May 08:3011 May 09:0024h 30mFilter replaced
LT-01Zone 3 over-schedule08 May 09:0008 May 11:202h 20mSchedule corrected
PMP-02Discharge pressure spike05 May 14:0005 May 15:451h 45mPRV adjusted
AI Detection Rules — Active
Configured thresholds · BuildOptix ML engine
+ Add Rule
Rule NameSystemConditionSensitivityStatus
Chiller COP DegradationChillerCOP < 5.5 for 30 minMediumActive
AHU Filter Clog PredictorAHUΔP trend > 8 Pa/dayLowActive
Pump Vibration SignaturePumpsFFT pattern change >15%HighActive
Energy Over-ScheduleAll>20% vs scheduled baselineMediumActive
Cooling Tower Approach DriftCTApproach temp rise >1°C/7dMediumActive
System Uptime
99.8%
30-day average
Active Faults
2
critical systems
Sensors Online
2,148
of 2,156 total
Offline Sensors
8
network timeout
System Live Status
BMS Core Platform
Online
IoT Sensor Network
99.6% active
HVAC Controller Zone C
Fault
Lift Control Group
Degraded
Fire Panel Network
Normal
CCTV NVR
Recording
30-Day Uptime by System
HVAC99.2%
Fire Safety100%
Electrical99.8%
Lifts98.1%
CCTV100%
Overall Uptime (30d)
99.8%
MTBF
2,240hrs
MTTR
1.8hrs
Availability SLA
99.5%
target met ✓
Monthly Uptime Heatmap
Each cell = 1 day · colour = availability · May 2026
≥99.9% ≥99.5% ≥99% <99%
Upcoming PM Schedule — All Systems
SystemTaskDue DateFrequencyTechnicianStatus
CH-01 ChillerQuarterly service + water treatment22 May 2026QuarterlyHVAC Team AScheduled
BMS ControllersFirmware update + calibration25 May 2026Half-yearlyBMS EngineerScheduled
IoT Gateways (×8)Network health check + reboot28 May 2026MonthlyIT / BMSScheduled
SCADA ServerDB backup + OS patches31 May 2026MonthlyIT TeamScheduled
UPS — Server RoomBattery test + load transfer test05 Jun 2026QuarterlyElectrical TeamPending
Active Fault Log
SystemFault DescriptionSinceImpactAssigneeStatus
HVAC Zone CTemperature controller offline — Floor 708:14 AMHighHVAC Team AIn Progress
Lift-04Door sensor fault — communication error10:18 AMHighLiftPro ContractorOpen
IoT Gateway G-07Network timeout — 8 sensors unreachableYesterdayMediumIT TeamInvestigating
Active Alerts
7
3 critical · 4 warning
Acknowledged
12
today
Resolved (Today)
9
Avg Response
18min
Active Alert Feed
Auto-refresh · 30s
SeverityAlertSystemTimeStatusAction
CriticalHigh Condenser PressureCH-01 Chiller10:21 AMOpen
CriticalHVAC Temp Breach Floor 7AHU Zone C08:14 AMEscalated
CriticalDoor Sensor FaultLift-0410:18 AMOpen
WarningLow Chilled Water FlowCH-0110:15 AMAck'd
WarningHigh Water TempCT-0110:10 AMOpen
WarningHigh Vibration DetectedPMP-0109:55 AMAck'd
WarningUnauthorized Access — Loading BayCAM-0810:22 AMOpen
Critical Active
3
Critical Resolved Today
2
Avg Resolution Time
2.4hrs
Critical Alerts — Detail
CH-01 Chiller — High Condenser Pressure
Condenser pressure at 18.4 bar (limit: 17 bar). Check cooling water flow and condenser tube fouling. Chiller at risk of trip.
10:21 AM
AHU Zone C — Temperature Breach Floor 7
Zone C supply air at 22°C (setpoint 14°C). Controller offline since 08:14 AM. Tenant complaints received. Work order #1042 open.
08:14 AM
Lift-04 — Door Sensor Fault
Door closure sensor failed. Lift taken out of service at 10:18 AM. LiftPro contractor contacted. ETA: 2–3 hours.
10:18 AM
Warnings — Active (4)
AlertSystemValueThresholdTimeStatus
Low Chilled Water FlowCH-01118 m³/h130 m³/h min10:15 AMAck'd — monitoring
High Entering Water TempCT-0136.4°C35°C limit10:10 AMOpen
High VibrationPMP-012.1 mm/s2.0 mm/s09:55 AMAck'd — PM booked
Unauthorized AccessCAM-08Motion detectedRestricted zone10:22 AMOpen — security alerted
Resolved Today
9
Avg Resolution
1.6hrs
Auto-Resolved
4
Manual Close
5
Resolved Alerts — Today
AlertSystemRaisedClosedDurationClosed By
High Filter ΔPAHU-0207:30 AM09:15 AM1h 45mHVAC Team B
Low Battery — Fire PanelFP-0106:45 AM07:30 AM45mAuto-resolved
Damper stuck — AHU-03AHU-03Yesterday 23:0008:00 AM9hFM Team
Power factor lowMB-01Yesterday 22:0006:00 AM8hAuto-resolved
Today's DMR
Ready
auto-built 06:00
Today's HLP
Ready
auto-built 06:00
Email Delivery
On time
last sent 07:00
Next Auto-Email
Tomorrow 07:00
to CE + Property Head
Daily HLP Report
High-Level Performance · Daily
Consolidated daily snapshot for the Chief Engineer & Property Head — energy summary, DG & HVAC load, water & diesel, ambient conditions. Section totals roll up across the month.
Site
Godrej One, Vikhroli
Period
01–31 May 2026
Generated
Today · 06:00
Daily DMR Report
Daily Meter Reading · Meter-level
Full meter-level consumption — Incomer, DG, HVAC, Main, Common Area, Tenant, Water, Diesel/HSD, Gas & Temperature. One column per day with per-section totals, exactly as circulated to ops.
Site
Godrej One, Vikhroli
Period
01–31 May 2026
Meters
142 across 11 groups
Daily Meter Reading Report — DMR
Godrej One, Vikhroli · 01–05 May 2026 · BuildOptix IBOS
HLPDMR
BuildOptix IBOS · Generated 20 May 2026 06:00 IST · Confidential Page 1 of 1 · Auto-emailed daily 07:00 to CE & Property Head
Total Reports (May)
42
scheduled + custom
Delivered On Time
40
95.2% on-time rate
Next Scheduled
10 May 07:00
Daily Ops Summary
Failed Delivery
2
email bounce
Ready
Energy & Utilities Report
Floor-wise consumption, cost, EPI score, peak demand, tariff analysis.
Period
May 2026
Generated
20 May · 06:00
Ready
CO₂ & ESG Summary
Scope 1/2/3 emissions, solar offset, green certifications, ESG targets.
Period
April 2026
Generated
01 May · 09:00
Ready
SLA Compliance Report
Ticket resolution rates, breach log, response time by category, vendor SLA.
Period
April 2026
Generated
01 May · 09:00
Ready
Asset PM Report
PM completion rate, overdue maintenance, asset health trend, upcoming schedule.
Period
May 2026
Generated
05 May · 07:00
Ready
Solar Generation & ROI
kWh generated, grid savings, CO₂ offset, lifetime ROI vs CAPEX.
Period
May 2026
Generated
20 May · 06:00
Scheduled
Compliance Audit Trail
User actions, RBAC logs, data exports, system config changes. SOC 2 ready.
Period
Monthly
Scheduled
01 Jun · 00:00
Utility Bills (May)
₹34.2L
vs Budget
₹2.1L saved
Pending Payment
₹9.7L
Paid This Month
₹24.5L
Utility Bills — May 2026
Export XLSX →
Bill TypePeriodAmountDue DateStatusAction
Electricity — MSEDCLApr 2026₹14.06L25 MayPaid↓ Download
Electricity — DG Fuel (HSD)Apr 2026₹2.80L20 MayPaid↓ Download
Water — MCGMApr 2026₹1.20L28 MayPaid↓ Receipt
HVAC Maintenance AMCMay 2026₹1.50L31 MayPaid↓ Receipt
Elevator AMCMay 2026₹0.80L15 JunUpcoming
Scheduled Reports
18
Sent On Time (May)
16/18
Failed Deliveries
2
Next Run
10 May 07:00
Scheduled Report Configuration
Automated email delivery · frequency · recipients · CC · retry-on-fail
+ Add Schedule
ReportFrequencyTimeFormatRecipients (To / CC)Retry on FailLast SentStatusAction
Daily HLP ReportDaily07:00 AMPDF + XLSXCE, Property Head / GM, Ops Head3× / 30 minToday 07:00ActiveEdit
Daily DMR ReportDaily07:00 AMPDF + XLSXCE, Property Head / Energy Mgr3× / 30 minToday 07:00ActiveEdit
Daily Ops SummaryDaily07:00 AMPDFFM, GM, Property HeadOnToday 07:00ActiveEdit
Weekly Energy ReportEvery Monday08:00 AMXLSX + PDFEnergy Mgr, CFOOn05 MayActiveEdit
Monthly CO₂ & ESG1st of month09:00 AMPDFSustainability Head, BoardOn01 MayActiveEdit
SLA Compliance Report1st of month09:00 AMXLSX + PDFFM, Ops HeadOn01 MayActiveEdit
Asset PM ScheduleWeekly · Mon07:00 AMXLSXFM, Maintenance TeamOn05 MayActiveEdit
Anomaly DigestWeekly · Fri18:00PDFFM, Engineering HeadOn02 MayFailed 09 MayRetry
Custom Reports (May)
24
Avg Build Time
3.2sec
AI-powered
Most Requested
Energy
by floor · 9 of 24
Exports (May)
142
Build a Custom Report
Select parameters and generate instantly
Report Type
EnergyCO₂ / ESGSLAAssetsComplaintsVendor
Date Range
TodayThis WeekThis MonthLast MonthCustom
Sites
All SitesMumbaiDelhiBengaluruHyderabad
Output Format
PDFXLSXCSV
Recent Custom Reports
ReportGeneratedByFormatAction
Energy by Floor — MayToday 08:45Rajesh S.XLSX↓ Download
SLA Report — Apr–May09 May 07:00SystemPDF↓ Download
CO₂ Comparison Q108 May 15:30Priya M.PDF↓ Download
Vendor Scorecard Q107 May 11:00Arun K.XLSX↓ Download
Asset PM Summary06 May 09:00SystemXLSX↓ Download
Active Logbooks
6
digital · all sites
Entries Today
214
across all logbooks
Pending Sign-off
7
CE / Property Head
Audit Events (30d)
1,482
immutable log
DG Set Log
Hourly · per genset
Last Entry
Today 14:00
Recorded By
R. Sharma
Entries (May)
186
Sign-off
2 pending
Energy / Meter Readings Log
Daily 06:00 · all meters
Last Entry
Today 06:00
Recorded By
A. Khan
Entries (May)
31
Sign-off
Up to date
HVAC & Chiller Plant Log
2-hourly · plant room
Last Entry
Today 14:00
Recorded By
S. Patil
Entries (May)
124
Sign-off
3 pending
Water Treatment / STP / WTP Log
Shift-wise · 3× daily
Last Entry
Today 13:30
Recorded By
M. Rao
Entries (May)
93
Sign-off
Up to date
Fire Pump & Life-Safety Log
Daily + weekly test
Last Entry
Today 08:00
Recorded By
D. Verma
Entries (May)
38
Sign-off
2 pending
Lift / Elevator Log
Daily · per car
Last Entry
Today 09:15
Recorded By
LiftPro AMC
Entries (May)
62
Sign-off
Up to date
DG Set Energy / Meters HVAC & Chiller Water / STP Fire Pump Lift
DG Set Log — Entries & History
Historical records · readings · remarks · sign-off
7 days30 daysCustom
Download
Date / TimeShiftKey ReadingsRecorded ByRemarksSign-offAction
Awaiting Sign-off
7
CE / Property Head
Overdue (>24h)
2
escalate
Signed Today
19
Avg Sign-off Time
3.4h
Sign-off Queue
Add a remark and sign-off — recorded to the audit trail
EntryLogbookRecorded ByLoggedWaitingAdd Remark & Sign-off
Audit Trail
Immutable, time-stamped record of every logbook action — who, what, when
Export Audit Log
All eventsCreatedSigned-offEditedExported
Active Vendors
38
across all categories
Expiring Contracts (30d)
4
renewal action required
Avg Scorecard
84%
target ≥80%
Pending Invoices
11
₹24.6L outstanding
Vendor Directory
All active vendors · sorted by category
+ Add Vendor
VendorCategoryContactContract ValueContract ExpiresScorecardStatus
CoolTech HVAC Pvt LtdHVAC MaintenanceRavi Kumar₹18L/yr31 Jul 202691%Active
SparkElec ServicesElectrical MaintenanceAnjali S.₹12L/yr31 May 202678%Expiring
LiftPro IndiaElevator AMCSuresh P.₹9.6L/yr30 Sep 202688%Active
AquaPure Water MgmtWater TreatmentPriya M.₹6L/yr15 Jun 202675%Expiring
SecureEye CCTVSecurity & SurveillanceDeepak V.₹8L/yr31 Dec 202695%Active
FireGuard SystemsFire Safety AMCArun K.₹7.2L/yr28 Feb 202792%Active
CleanBuild FMHousekeeping & FMMeena R.₹36L/yr31 Mar 202767%Under Review
SolarMax EnergySolar O&MKiran T.₹4.8L/yr31 Oct 202697%Active
Total Contract Value
₹1.86Cr/yr
Expiring in 30 Days
4
Renewals Initiated
2
Lapsed / Expired
0
Contract Renewal Pipeline
VendorCategoryExpiryRenewal ValueStageAction
SparkElec ServicesElectrical31 May 2026₹13.2L/yr (+10%)Negotiation
AquaPure WaterWater Treatment15 Jun 2026₹6.6L/yr (+10%)Draft Sent
LiftPro IndiaElevator AMC30 Sep 2026₹10.2L/yr (+6%)Not Started
SolarMax EnergySolar O&M31 Oct 2026₹5.0L/yr (+4%)Not Started
Pending Invoices
9
₹21.6L outstanding
Overdue (>30d)
2
₹1.3L
Paid This Month
19
₹45.3L cleared
Avg Payment Cycle
24days
Pending Invoices
Export XLSX →
Invoice #VendorAmountInvoice DateDue DateDays OutstandingStatus
INV-2026-0442CoolTech HVAC₹1,50,00001 May31 May8Approved
INV-2026-0438CleanBuild FM₹3,00,00025 Apr25 May14Paid
INV-2026-0421SparkElec₹98,00015 Apr15 May24Approved
INV-2026-0408LiftPro India₹80,00008 Apr08 May31Overdue
INV-2026-0401AquaPure₹50,00001 Apr01 May38Overdue
Portfolio Avg Score
84%
Top Performer
SolarMax
97% score
Under Review
1
CleanBuild FM
Next Review
Q3 2026
Vendor Scorecards — Q1 2026
SolarMax Energy
97%
SecureEye CCTV
95%
FireGuard Systems
92%
CoolTech HVAC
91%
LiftPro India
88%
SparkElec Services
78%
AquaPure Water
75%
CleanBuild FM
67%
SLA Compliance (May)
96.8%
target 95% ✓
Breaches (May)
3
2 HVAC · 1 FM
Near-breach Today
2
tickets at risk
Avg Close Time
1.4hrs
target 2 hrs ✓
SLA Compliance Trend
Monthly · Jan–May 2026
100%98%96%94% Target 95% Jan 97.2% Feb 98.4% Mar 97.8% Apr 94.1% May 96.8%
Compliance by Category
Critical (P1)
94%
High (P2)
97%
Medium (P3)
98%
Low (P4)
99%
HVAC Tickets
91%
FM / Housekeeping
96%
Near-Breach Tickets — Action Required
Tickets at risk of SLA breach today
Ticket #DescriptionPrioritySLA TargetTime OpenRemainingAssigned To
#1041Water leakage — Main LobbyCritical P14 hrs5 hrs 12 minBREACHEDFM Team — pending contractor
#1042AC not cooling — Room 704High P28 hrs3 hrs 20 min4 hrs 40 minHVAC Team A — in progress
Total Breaches (May)
3
Penalty Applicable
1
contractual clause
Root Cause Closed
2
Avg Overrun
1.2hrs
SLA Breach Log — May 2026
Ticket #DescriptionPrioritySLAActual CloseOverrunRoot CauseResolution
#1041Water leakage — LobbyP14 hrs5 hrs 12 min+72 minContractor unavailablePending
#1029HVAC total failure — Floor 4P14 hrs5 hrs 48 min+108 minPart unavailableClosed
#1017Lift stuck — Tower BP28 hrs9 hrs 20 min+80 minTechnician delayClosed
Response Time Trend
Average by priority · Jan–May 2026
P1 Avg Response
42 min
P2 Avg Response
1.8 hrs
P3 Avg Response
3.2 hrs
P4 Avg Response
6.1 hrs
Breaches by Category
Jan–May 2026
14 Total
HVAC6
FM / Housekeeping4
Electrical3
Others1
Our Compliance
96.8%
Industry Average
94.2%
Top Quartile
98.1%
Our Rank
2nd Quartile
SLA Benchmarks — Commercial Real Estate India 2026
Top Quartile
98.1%
BuildOptix (Us)
96.8%
Industry Avg
94.2%
Bottom Quartile
88.0%
Fire System Status
Normal
All 128 zones clear
Detectors Online
482/482
100% reporting
Open H&S Incidents
2
minor · investigation open
Last Fire Drill
03 May
17 days ago
Compliance Score
97%
NBC 2016 · Fire NOC ✓
Life Safety Systems — Status Overview
All building safety systems · Live
  Fire Detection & Suppression
All Clear
  Emergency Evacuation Routes
Unobstructed
  First Aid Stations (14)
Stocked
  PA / Emergency Communication
Tested
  Stairwell Lighting
FL4 dim — work order raised
  CCTV Surveillance
24 / 24 Online
  DG / Emergency Power
Armed & Ready
Compliance Calendar
✓ Fire NOC — Renewed
Valid until 31 Dec 2026 · MCFD
✓ Annual Fire Audit Passed
04 Feb 2026 · Next: Feb 2027
⚠ Fire Extinguisher Recharge Due
14 of 96 extinguishers — due 31 May 2026
ℹ Quarterly Fire Drill Planned
Scheduled: 05 Jun 2026 · 10:00 AM
Panel Status
Normal
Active Zones
128
all healthy
Smoke Detectors
482/482
Sprinkler Pressure
4.2bar
Battery Backup
24.4V
Sprinkler System — Pressure Trend
bar · Last 24 hours · All zones
Pressurised
5.04.54.0 Min 3.5 bar 00:0006:0012:0018:00Now
Fire Detector Events — 30 Days
Alarms · Faults · Test events
Test drill Dirty det. 01 May 10 May 20 May
Battery Voltage — Fire Panel
V · 24-hour trend
25V24V 0012Now
Zone Status Matrix
30 Normal 1 Fault 1 Maint
Extinguisher Inventory
CO₂ (BC class)
36 / 36
ABC Dry Powder
28 / 28
Water (Class A)
17 / 20 ⚠
K-Class (Kitchen)
9 / 12 ⚠
⚠ 14 extinguishers due recharge by 31 May
Evacuation Routes
Clear
all exits unobstructed
Assembly Points
4
marked & accessible
Last Drill Time
8.4min
full building 03 May
Max Occupancy
2,048pax
NBC 2016 limit
Evacuation Route Status — Vikhroli
All floors · Exit signage · Emergency lighting
LocationRouteExit WidthEmergency LightSignageStatus
Stairwell S1 — Tower AAll floors → Ground1.5mWorkingOKClear
Stairwell S2 — Tower AAll floors → Ground1.5mWorkingOKClear
Fire Escape — East WingFl 4–7 → Ground1.2mFL4 Dim ⚠OKWork Order
Main Lobby ExitGround → Assembly A4.5mWorkingOKClear
Basement Exit B1B1 → Open Air2.4mWorkingOKClear
Terrace AccessRoof → Helo Evac0.9mWorkingOKClear
Drill Performance History
Evacuation time · All staff · Vikhroli
15m10m5m NBC limit 10m Aug 25 Nov 25 Feb 26 Mar 26 May 26 ✓ 12.8m 11.2m 10.5m 9.6m 8.4m
Open Incidents (2026)
2
Closed This Year
14
Days Since Last LTI
284
Lost Time Injury
Near Misses
3
reported YTD
Open Incident Register
+ New Incident
Incident #DescriptionDateLocationSeverityInjuredStatusInvestigator
INC-2026-018Slip on wet floor — Lobby18 May 2026Ground LobbyMinor1 (visitor)InvestigationSafety Officer
INC-2026-015Near-miss — electrical panel open12 May 2026Basement B1Moderate0Root Cause AnalysisEHS Manager
Closed Incidents — 2026 YTD
Incident #DescriptionDateSeverityRoot CauseClosed
INC-2026-012Minor cut — maintenance work02 MayMinorPPE not worn09 May ✓
INC-2026-008Near-miss — ladder fall risk14 AprModerateImproper ladder use22 Apr ✓
INC-2026-003Smoke detector false alarm20 MarMinorDusty sensor21 Mar ✓
H&S Compliance Score
97%
Valid Certifications
12/12
Due for Renewal (60d)
2
Staff Trained (2026)
98%
Statutory Compliance Register
All certifications · Vikhroli site
CertificateIssuing AuthorityValid UntilStatus
Fire NOCMumbai CFO / MCFD31 Dec 2026Valid
Occupancy CertificateMCGMPermanentValid
Lift Inspection CertificateDept. of Steam Boilers30 Jun 2026Renewal Due
Electrical Safety AuditMSEDCL / CEA15 Jan 2027Valid
DG Set RegistrationPollution Control Board31 Jul 2026Renewal Due
Water Treatment LicenseBMC31 Mar 2027Valid
LEED CertificationIGBC / GBCINov 2027Gold
ISO 45001 — OHSBureau VeritasOct 2026Certified
H&S Training Compliance
Fire Safety Induction
98%
Emergency First Aid
88%
Evacuation Drill Participation
100%
PPE Usage Compliance
94%
Hazardous Material Handling
85%
Working at Height
92%
Overall H&S Training Score 93.5%
Zones Normal (CO₂)
14/18
<800 ppm
Zones Elevated
3
800–1000 ppm
Zones Critical
1
>1000 ppm — Floor 5
Avg PM2.5
14.2µg/m³
WHO 24h: <15 ✓
Avg Humidity
54%
ASHRAE 55 range ✓
Zone-by-Zone IAQ Status — Vikhroli
<800 ppm Good 800–1000 Elevated >1000 Critical
Floor 5 — Zone ACritical
CO₂1,148 ppm
PM2.518.4 µg/m³
TVOC280 ppb
Humidity57%
Temp23.4 °C
⚠ DCV triggered — fresh air damper 100%
Floor 4 — ConferenceElevated
CO₂924 ppm
PM2.511.2 µg/m³
TVOC180 ppb
Humidity52%
Temp22.8 °C
Floor 6 — Open Office BElevated
CO₂870 ppm
PM2.59.8 µg/m³
TVOC142 ppb
Humidity49%
Temp23.1 °C
Floor 3 — Open Office AGood
CO₂648 ppm
PM2.58.1 µg/m³
TVOC110 ppb
Humidity51%
Temp22.6 °C
Ground — Lobby / ReceptionGood
CO₂512 ppm
PM2.512.4 µg/m³
TVOC98 ppb
Humidity55%
Temp24.0 °C
Basement B1 — ParkingGood
CO (carbon monoxide)4.2 ppm
CO ThresholdAlarm: 50 ppm
CO₂490 ppm
NOₓ0.04 ppm
VentilationAuto — OK
CO₂ Floor Heatmap — Live (ppm) · ASHRAE 62.1 Thresholds
Floor 7
624
611
648
635
618
602
Floor 6
712
845
870
858
780
721
Floor 5
1148
1092
944
910
782
748
Floor 4
688
924
912
788
742
698
Floors 1–3
648
612
620
598
604
618
<800 Good 800–1000 Elevated (DCV activates) >1000 Critical (alarm + DCV max)
ASHRAE 62.1 Compliance
94%
zones in compliance
WELL Std v2 — IAQ
Pass
Preconditions met
NBC Part 8 Log
21days
of 30d data logged
LEED EQ Credit
6/8 pts
IAQ management plan
IAQ Parameter — ASHRAE 62.1 / WELL v2 Compliance Check
Export PDF
ParameterASHRAE 62.1 LimitWELL v2 LimitCurrent AvgWorst ZoneStatus
CO₂1000 ppm (max)1000 ppm712 ppm1148 ppm (F5A)1 Zone Breach
PM2.515 µg/m³ (24h)15 µg/m³14.2 µg/m³18.4 µg/m³ (F5A)Pass (avg)
TVOC500 ppb500 ppb168 ppb280 ppbPass
Relative Humidity30–60%30–60%54%57%Pass
Temperature20–26°C (ASHRAE 55)18–27°C23.2°C24.0°CPass
CO (Parking)25 ppm TWA9 ppm4.2 ppm4.2 ppmPass
HCHO (Formaldehyde)0.1 ppm0.06 ppm0.02 ppm0.03 ppmPass
CO₂ Trend — Floor 5A (Critical Zone)
Last 12 hours
1200 900 600 1000 alarm 800 DCV 08:0010:0012:0014:00
NBC Part 8 Monthly IAQ Log
Auto-generated · May 2026
DateAvg CO₂Avg PM2.5Worst ZoneAction
27 May712 ppm14.2 µg/m³F5A — 1148DCV Active
26 May688 ppm11.8 µg/m³F4 — 842Normal
25 May704 ppm12.1 µg/m³F6 — 888Normal
24 May664 ppm10.4 µg/m³F4 — 814Normal
Power Factor (Incomer 1)
0.82
Below 0.85 — PF penalty
Voltage THD
3.1%
IEEE 519: <5% ✓
Voltage Unbalance
0.6%
Limit 2% ✓
Capacitor Bank
180kVAr
3 / 4 steps ON
Est. PF Penalty (MTD)
₹18,400
MSEDCL tariff clause
Incomer 1 — Main LT (1000 kVA)
Incomer 2 — Emergency (500 kVA)
Solar Feed-in (200 kWp)
3-Phase Power Parameters — Live
Incomer 1 · 415V L-L · 10:24 AM
0.82 Pwr Factor
R Phase
V (R-N)229 V
Current818 A
kW188 kW
Y Phase
V (Y-N)230 V
Current815 A
kW188 kW
B Phase
V (B-N)231 V
Current812 A
kW187 kW
Total kW
563
kVA
686
Frequency
49.98 Hz
Harmonics Spectrum — Voltage THD
IEEE 519 limit: 5% total
3rd
2.8%
5th
0.9%
7th
0.5%
9th
0.3%
11th
0.2%
13th
0.1%
IEEE 519: 5%
✓ Total THD 3.1% — within IEEE 519 limit. No harmonic filter required currently.
Capacitor Bank — Reactive Power Compensation
Auto APFC · Target PF 0.95
Manual Override
Step 1
60 kVAr
ON
Step 2
60 kVAr
ON
Step 3
60 kVAr
ON
Step 4
60 kVAr
OFF
⚠ PF currently 0.82 — below MSEDCL target of 0.85. Estimated monthly penalty: ₹18,400. Recommend switching Step 4 ON and reviewing load mix.
Power Factor Trend — Last 7 Days
0.95 0.90 0.85 0.85 target MonTueWedThuFriSatSunToday
Doors Online
42/44
2 offline — maintenance
Forced Open
1
B1 — Stairwell door
Occupancy Now
1,840
of 2,048 max
Access Granted (Today)
4,218
Access Denied (Today)
14
3 anti-passback, 11 invalid
Door Status Map — All Access Points
Stairwell S1 — B1
Basement Level 1
FORCED OPEN09:48 AM
⚠ Alert sent to security desk
Main Lobby — Entrance
Ground Floor
OPENBusiness Hours
Floor 5 — Server Room
Floor 5 · Restricted
SECUREDCard + PIN
Rooftop Access
Roof Level
SECUREDCard only
Car Park Exit Gate
Basement Entry
HELD OPEN>10 min
Ground — Loading Bay
Ground Floor Rear
OPENDelivery window
Zone Occupancy Count
842
Tower A — All Floors
624
Tower B — All Floors
248
Basement Parking
126
Common Areas
Live Access Log
Real-time entry / exit events
Export
TimeCard HolderDoor / ReaderZoneDirectionResult
10:24:12Rajesh KumarFloor 5 — Server RoomRestrictedINGRANTED
10:22:48Unknown CardRooftop AccessRoofINDENIED
10:21:05Priya SharmaMain LobbyGroundINGRANTED
10:19:44Delivery PersonnelLoading BayGroundINGRANTED
10:17:33Amit VermaCar Park ExitB1OUTGRANTED
10:15:22Anti-PassbackFloor 3 — Lift LobbyTower AINDENIED
10:12:08Suman BoseMain LobbyGroundINGRANTED
10:09:55Security Guard AControl RoomGroundINGRANTED
Lockdown Status
NORMAL
No active lockdown
Emergency Exits
All Unlocked
Fire-safe mode
Last Lockdown Test
15 Apr 2026
Full drill
Lockdown Control
ISO/IEC 60839-11 · NBC 2016
✓ Emergency exits remain unlocked during any lockdown event (NFPA 101 / NBC Part 4 compliance)
Access Group Summary
GroupZones AllowedActive UsersTime Restriction
Full AccessAll zones1224×7
EmployeesFloors 1–7, Parking1,42006:00–22:00
ContractorsBasement, Mechanical4808:00–18:00
IT AdminServer Room (F5), Control624×7 + OTP
VisitorsLobby, Meeting Rooms8409:00–19:00
Active Faults
4
1 critical · 2 high · 1 medium
Energy Waste (Today)
184kWh
from active faults
Faults Resolved (7d)
11
FDD Rules Active
48
across all systems
ML Anomalies Detected
3
this week
AHU Supply Temp > Mixed Air Temp — Possible Cooling Failure
AHU-B3 · Floor 7 Wing C · Rule: FDD-HVAC-001
Critical 08:14 AM
Rule: Supply Air Temp > Mixed Air Temp for >15 min indicates economizer fault, stuck cooling valve, or chilled water supply failure to AHU coil. Detected at 07:59 AM · Duration: 75 min.
Supply Air Temp 18.4°C
Mixed Air Temp 14.2°C
ΔT +4.2°C (fault)
CHW Supply 8.8°C (high)
Est. Waste 94 kWh
Chiller COP Below Design Threshold — Possible Condenser Fouling
CH-02 · Chiller Plant · Rule: FDD-CHW-003
High Yesterday
Rule: Chiller COP below 4.2 (design 5.8) for >3 hours at >70% load indicates fouled condenser tubes, refrigerant undercharge, or condenser water temp issue. Detected trend over 3 days.
Current COP 3.9
Design COP 5.8 at full load
Load 74%
Condenser ΔT 6.8°C (high)
Est. Waste 68 kWh/day
Motor Power Deviation +22% Above Baseline — PMP-02 Pump
PMP-02 · Domestic Water · Rule: FDD-ELEC-007
High 2 days
Rule: Motor power >15% above ML baseline (at same flow rate) for >48h indicates worn impeller, partially blocked strainer, or impending bearing failure. Anomaly score: 2.4σ
Current Power 18.3 kW
ML Baseline 15.0 kW
Flow Rate unchanged 42 m³/h
Anomaly σ 2.4σ
HVAC Running Outside Occupied Hours — Floor 2 East AHU
AHU-F2E · Floor 2 · Rule: FDD-SCH-011
Medium 3 days
Rule: AHU running at 100% capacity beyond 20:00 when occupancy sensor shows zero occupancy for that zone. Est. wasted energy: 22 kWh/day × 3 days = 66 kWh. Check schedule configuration.
Running Since 3 consecutive days after 20:00
Occupancy Zero after 19:30
Est. Waste 66 kWh total
ML Models Active
24
one per major asset
Anomalies This Week
3
False Positives (30d)
4%
Mean Time to Detect
2.4hrs
ML Anomaly Detection — Asset Power Signatures
Baseline vs actual · 2σ threshold
PMP-02 PumpPower 22% above ML baseline at same flow — impeller/bearing issue probable+22% ⚠2.4σ
CH-02 ChillerCOP trending down 3.1% per day for last 5 days — condenser fouling suspected−15.5% COP1.9σ
CT-01 Cooling TowerApproach temperature rising 0.4°C/day — fill pack fouling or water distribution issue+1.8°C1.6σ
AHU-B3Supply–return temp differential collapsed — cooling coil bypass or valve faultΔT 4.2°C3.1σ
SM-01 Smart MeterWeekend consumption 8% above same-weekend baseline — phantom load investigation needed+8%1.4σ
Active Permits
3
Pending Approval
2
Closed Today
4
Contractors On-Site
12
Zero LTI Streak
284days
Active & Pending Permits
PTW-2026-042 LOTO — Electrical Isolation of LT Panel — MCC-B2 for Cable Replacement Active
Location
Basement B2 — MCC Room
Contractor
Voltex Electricals Pvt Ltd
Authorized By
Rajan Mehta (FM Manager)
Valid From
27 May, 08:00 AM
Valid Until
27 May, 05:00 PM
Workers On-site
4 workers
LOTO Isolation Checklist
Main incomer CB tripped and locked✓ 08:12
Voltage tested — confirmed dead (multimeter)✓ 08:18
Earthing leads applied to all phases✓ 08:22
Safety sign "Do Not Energize" posted✓ 08:25
PPE verified: Class E gloves, arc flash suit✓ 08:28
Work completion verification by FM SupervisorPending
PTW-2026-041 HOT WORK Welding — Condenser Water Pipe on Mechanical Floor Active
PTW-2026-043 CONFINED SPACE STP Underground Tank Inspection — Tank T-3 Pending Approval
PTW-2026-044 WORK AT HEIGHT Rooftop Solar Panel Cleaning — Array Section C Pending Approval
PTW Compliance Rate
100%
all work under permit
Permits Issued (2026)
186
Violations (2026)
0
Avg Permit Duration
4.8hrs
Permit Register — May 2026
Export
Permit #TypeWork DescriptionContractorIssuedClosedStatus
PTW-2026-042LOTOMCC-B2 Cable ReplacementVoltex Electricals27 May 08:00Active
PTW-2026-041Hot WorkCondenser Pipe WeldingIndoWeld Services27 May 07:30Active
PTW-2026-040Cold WorkAHU Filter Replacement — B3CoolAir Maint26 May 09:0026 May 13:30Closed
PTW-2026-039HeightFalse Ceiling — Floor 4BuildFix India25 May 08:0025 May 17:00Closed
PTW-2026-038ConfinedUnderground Tank CleaningCleanPro Services23 May 07:0023 May 15:00Closed
Living registry — keep it in sync. Whenever a module, page or service is added or changed, update its endpoints here so this stays the single source of truth for every API across BuildOptix.
Total Endpoints
across all categories
Stable / GA
production ready
Beta
subject to change
Deprecated
scheduled for removal
Categories
10
5 core · 5 supporting
API Categories
Click a category to filter the catalog
Platform API Architecture
Request flow from client to data — every layer is catalogued
ClientsWeb console · Mobile FM app · Kiosks · Equipment view
API GatewayTLS termination · JWT/OAuth2 verification · rate limiting · request routing
Frontend / BFF APIsAggregated, screen-shaped payloads for each dashboard page
Backend MicroservicesEnergy · Assets · Service Desk · Safety · Analytics domain logic
Data LayerPostgreSQL (config & transactions) · TimescaleDB (telemetry) · object store
Real-time bus — MQTT / WebSocket / SSE
Third-party — BMS, payments, weather, comms
Versioning

URI versioning (/api/v1/…). Breaking changes ship a new major version; the previous one is supported for a 6-month deprecation window flagged in this registry.

Authentication & Authorization

OAuth2 / JWT bearer tokens at the gateway. Short-lived access tokens + refresh tokens. Every endpoint declares the role/scope it requires (RBAC).

Rate Limiting & Quotas

Per-client token-bucket limits returned via X-RateLimit-* headers. Telemetry ingest and report exports have dedicated higher quotas.

Consistent Error Format

Standard envelope: { error: { code, message, traceId } } with correct HTTP status codes. traceId links to logs for support.

Pagination & Filtering

Cursor-based pagination (?cursor=&limit=) for large collections. Standard sort, filter and fields query params across list endpoints.

Documentation

Every endpoint is described by an OpenAPI 3.1 spec. This registry is generated from the same contract so docs and reality never drift.

Observability

Structured logs, distributed tracing (trace IDs) and per-endpoint latency/error dashboards. Health & readiness probes on every service.

Security Hardening

Input validation, output encoding, least-privilege DB roles, secrets in a vault, signed webhooks, and audited admin actions. OWASP API Top-10 reviewed each release.

Registry Maintenance Workflow

This page is the single source of truth. When any module or page changes: (1) add/update the endpoint in the catalog with its owning module, (2) set the correct status (stable / beta / deprecated) and version, (3) note auth scope & rate-limit class, and (4) confirm the OpenAPI spec matches. Reviewed at every release sign-off.

Floors Modelled
19
B2 → Terrace
Zones Mapped
240
Live Data Points
4,820
streaming
Model Sync
Live
< 2s latency
Twin Health
98%
Floor Stack
Click a floor to inspect · colour = status
Building Model
Whole-building view
Active Floor
Ground
Zones on Floor
16
Avg Temp
23.4°C
Occupancy
68%
Open Alarms
2
Ground Floor — Temperature
Zone heatmap · live
Live
Equipment Mapped
86
Running
79
Faults
3
Maintenance Due
4
Spatial Map
Equipment positioned on the twin · colour = status
Equipment
Click to locate
Sensors Online
312/318
Polling Rate
5s
Threshold Alerts
2
Last Update
just now
Sensor Overlay
Live readings mapped to zones
LIVE
Live Readings
Updating every 5s
Total Users
Active
Administrators
Pending Invites
Global Users
Define roles and tune per-module access. Changes apply across the platform.
Permission Matrix
Role-based access control (RBAC) · ✓ full · ◐ limited · — none
Events (24h)
Logins (24h)
Password Resets
Role / Access Changes
User Activity & Audit Trail
Immutable log · logins, password resets, role & access changes, MFA and device events · 90-day retention
Export CSV →
Device security is managed centrally by administrators
End users cannot change these settings. Policies apply on first login after Username, Password and MFA verification.
Trusted Devices
Device-Locked Accounts
Pending Re-registration
Blocked Devices
Device Security Policy
Backend-managed · applies platform-wide
First-Login Trust Flow
How a device becomes trusted
Trusted Device Registry
View, remove or re-register devices bound to user accounts
User
Site Profile
Operating Schedule
Units & Localisation
Comfort & Alert Thresholds
Towers / Wings
Total Floors
Blocks / Areas
Gateways
Controllers
Towers & Wings
Define the physical structure of the site
Block / Area Types
Standard space categories used across all floors
Structure Tree
Site → Tower → Floors → Blocks
Setup workflow. 1) Define towers/wings & floors → 2) add blocks/areas per floor → 3) go to Gateways & Controllers to place a gateway in each block and map its controllers. New towers, floors or blocks can be added any time — the gateway tree expands automatically for future growth.
Gateways Online
Gateways Offline
Controllers Mapped
Data Points
Online Degraded Offline
Connected
6
Needs Attention
1
Available
2
Data Synced (24h)
1.2M
records
Security Score
A−
87 / 100
MFA Coverage
92%
Patch Compliance
88%
4 devices pending
Cert Expiry
23d
api.buildoptix.in
Open Vulnerabilities
2
1 high · 1 medium
Control Posture
IEC 62443 · ISO 27001 aligned
Security Event Log
Authentication, access and threat events
BuildOptix Design System
A dark-first operations console. Every screen is built from the same tokens, type scale, icon set and components documented here — so the platform stays consistent as new modules ship.
Tokens v1 · live from :root Inter + JetBrains Mono Tabler Icons 3.22.0
Dark-first console
Deep cool canvas (--bg-0--bg-2) with surfaces that lift off the page. A light theme mirrors every token.
Status-driven colour
Colour carries meaning — green/amber/red for OK·warn·fault. Brand copper-amber is reserved for navigation & emphasis.
Calm geometry
8px base radius (--radius), 10px for cards. Hairline borders, soft inner highlights, restrained shadows.
Mono for data
JetBrains Mono for every number, ID, timestamp and code value — so tabular data lines up and reads precisely.
Foundations at a glance
The constants every screen inherits
Do & Don't
Keeping new work on-system
Use the tokens. Reference var(--info), never a raw hex. Tokens flip correctly between dark & light.
Reuse components. .card, .kpi, .badge, .btn and .pill cover most layouts.
Mono the data. Apply --font-mono to numbers, IDs and timestamps.
Don't invent colours or pull in icon sets beyond Tabler.
Don't hard-code spacing with arbitrary pixels where a component already defines it.
Tabler Icons 3.22.0 · click any icon to copy its ti ti-* class
Typography
Inter for UI · JetBrains Mono for data
Buttons
.btn · .btn.primary
Badges & Pills
Status & state
Active Pending Inactive
On Off Global Local
KPI Tiles
.kpi with .glow-* status rail
Total Assets
1,248
across 4 sites
Uptime
99.4%
Open Faults
12
Critical
2
Card
Header (.ch) + body (.cb)
Action →
The container for nearly everything — title via .ct, subtitle via .cs, optional action link via .ca, content in .cb.
Form Controls
Inputs & selects
Toggle switch
Live token values for the current theme · click any swatch to copy its var(--token)
Consumption — May 2026
Vikhroli · Trend Analysis
Selected
6,553 kWh
EnergyMay 2026
Monthly
Daily
Hourly
Monthly Consumption — 2026
YTD Total
7,56,540 kWh
Avg Monthly
1,51,308 kWh
Peak Month
Apr 1,70,829 kWh
YTD Cost
₹74.9L
Click a month bar → view daily breakdown
180K 140K 100K 60K 0 Budget 132,128 Jan 138,619 Feb 157,133 Mar 170,829 Apr ↑ 157,440 May ● Jun Jul Aug Sep Oct Nov Dec
Daily Breakdown — May 2026
MTD Total
1,42,000 kWh
Avg/Day
6,290 kWh
Peak Day
Day 13 10,668
Low Day
Day 12 2,143
Click a day bar → view hourly breakdown
12K 8K 5K 2K 0 Budget 1 2 3 4 5 6 7 8 9 10 11 12 13↑ 10668 14 15 16 17 18 19 20● 21 22 23 24 25 26–31 projected
Hourly — Today (May 20, 2026)
Peak Hour
12–1 PM 418 kWh
Off-peak
02–3 AM 92 kWh
Business hrs
4,820 kWh 74%
Cost at Peak
₹9.90/kWh TOD
Grid (kWh) Solar (kWh) Peak tariff zone
Peak Tariff Zone → 450 300 150 0 00 01 02 03 04 05 06 07 08 09 10 11 12↑ 13 14 15 16 17 18 19 20● Now 21 22 23
Top 5 Consumption Hours
HourkWhkW DemandSolar (kWh)Tariff ZoneCost
12:00–13:00418436 kW52Peak TOD₹4,138
13:00–14:00395412 kW48Peak TOD₹3,910
11:00–12:00380398 kW45Peak TOD₹3,762
10:00–11:00362378 kW42Peak TOD₹3,584
09:00–10:00348364 kW40Peak TOD₹3,445
AI·
3
System Online
Sites 5 / 6
Assets 2,148
Alarms 7
Power 12.84 MW
Latency 38ms
Last sync 2s ago
BO
BuildOptix
Vikhroli Campus
Overview
Operations
Maintenance & Service
Monitoring & Diagnostics
Safety & Compliance
Reports & Records
Equipment Detail
Add Schedule
Schedule Email Delivery
Automated report delivery to CE, Property Head & CC list
Chief Engineer Property Head GM Ops Head Energy Manager FM Team
PDF XLSX CSV
Retry on delivery failure
Re-attempt 3× at 30-minute intervals, then alert admin
Logbook Entry
Recorded Readings
Remarks
Audit Trail